(A) REMOVAL OF EXISTING LOADING RAMPWAY, ROOF & SIDEWALL FORMING COVERED LOADING BAY, FIRST FLOOR ACCESS STAIRS AND DECKING AND BOUNDARY WALLS (B) CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE EASTERN SIDE OF THE EXISTING FACTORY WITH A LOADING BAY, EXTENDED RAISED EXTERNAL LOADING AREA WITH NEW LOADING RAMPWAY SERVING BOTH TH EXISTING AND PROPOSED BUILDING AND A ESB SUB-STATION. ALL LINKED TO THE EXISTING BUILDING VIA A NEW CENTRAL STAIRWAY SERVING THE FIRST FLOOR OF THE EXISTING BUILDING. PEDESTRIAN ACCESSTO THE REAR OF THE BUILDING (C) NEW ESCAPE STAIRWAY FROM THE FIRST FLOOR OF THE EXISTING BUILDING (D) NEW ACCESS/CIRCULATION STAIRS & RAILINGS ADJACENT TO THE EXISTING LOADING BAY (E) REMOVAL OF EXISTING FACTORY WASTE WATER TREATMENT AND STORAGE TANKS AND INSTALLATION OF A NEW DAF (DISSOLVED AIR FLOATATION ) TANK TO TREAT THE FACTORY WASTE WITH A STORAGE TANK TO STORE THE LIQUID WASTE PRIOR TO REMOVAL OFF SITE (F) NEW SIGN TO THE ROAD FACING ELEVATION OF THE EXISTING BUILDING (G) ALL ASSOCIATED WORKS AND SITE WORKS INCLUDING CONNECTION TO EXISTING STORM SEWER, ADDITIONAL PARKING ETC. ALL LOCATED AT EXISTING PREMISES
(A) REMOVAL OF EXISTING LOADING RAMPWAY, ROOF AND SIDEWALL FORMING COVERED LOADING BAY, FIRST FLOOR ACCESS STAIRS AND DECKING AND BOUNDARY WALLS (B) CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE EASTERN SIDE OF THE EXISTING FACTORY WITH A LOADING BAY, EXTENDED RAISED EXTERNAL LOADING AREA WITH NEW LOADING RAMPWAY SERVING BOTH THE EXISTING AND PROPOSED BUILDING AND AN ESB SUB-STATION. ALL LINKED TO THE EXISTING BUILDING VIA A NEW CENTRAL STAIRWAY SERVING THE FIRST FLOOR OF THE EXISTING BUILDING. PEDESTRIAN ACCESS TO THE REAR OF THE BUILDING (C) NEW ESCAPE STAIRWAY FROM THE FIRST FLOOR OF THE EXISTING BUILDING (D) CONVERSION OF EXISTING OFFICES LOCATED ON THE FIRST FLOOR OF THE EXISTING FACTORY BUILDING INTO A LABORATORY WITH SEPARATE OFFICE (E) NEW ACCESS/CIRCULATION STAIRS AND RAILINGS ADJACENT TO THE EXISTING LOADING BAY (F) REMOVAL OF EXISTING FACTORY WASTE WATER TREAMENT AND STORAGE TANKS AND INSTALLATION OF A NEW DAF (DISSOLVED AIR FLOTATION) TANK TO TREAT THE FACTORY WASTE WITH A STORAGE TANK TO STORE THE LIQUID WASTE PRIOR TO REMOVAL OFF SITE (G) NEW SIGN TO THE ROAD FACING ELEVATION OF THE EXISTING BUILDING (H) REFURBISHMENT & EXTENSION OF EXISTING DWELLING LOCATED AT THE FRONT OF THE SITE (ROADSIDE) AND CONVERSION TO AN OFFICE INCLUDING AN EXTENSION TO THE REAR OF EXISTING BUILDING, RAISING THE EXISTING RIDGE LINE, ASSOCIATED BUIDLING SIGNAGE & RECONNECTION TO EXISTING FOUL AND STORM SEWERS (I) ALL ASSOCIATED WORKS AND SITE WORKS INCLUDING CONNECTION TO EXISTING STORM SEWER, ADDITIONAL PARKING ETC.
No Environment Impact Assesments Associated with this Application