Planning Application: 0850687 (Donegal County Council )
File Number:
0850687
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
23/12/2008
Decision Due Date:
25/02/2009
Validated Date:
23/12/2008
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
20/02/2009
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
AIRTRICITY DEVELOPMENTS (IRELAND) LTD AND COILLTE TEORANTA
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
CONSTRUCTION OF WINDFARM, CONSISTING OF 15 WIND TURBINES OF UP TO 3MW CAPACITY EACH OF UP TO 85M HUB HEIGHT AND UP TO 100M BLADE DIAMENTER WITH A TOTAL HEIGHT NOT EXCEEDING 135M, A PERMANENT METEOROLOGICAL LOGICAL LATTICE MAST 85M HIGH, A SUBSTATION AND ASSOCIATED EQUIPMENT, A BORROW PIT, INERNAL SITE TRACKS, SITE DRAINAGE AND ASSOCIATED WORKS
Development Address:
CARRICKALANGAN, MEENADAURA , CARK, CO DONEGAL
Architect Name:
Location Key:
CARRICKALANGAN
Electoral Division:
Meencargagh
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Yes
Comments:
DURATION EXTENDED FROM 29/03/2014 TO 29/03/2019 UNDER REF NO 13/51609
Decision
Decision Date:
20/02/2009
Manager Order:
2009pm070
Decision Type:
Conditional
Number of Conditions:
12
Grant Date:
30/03/2009
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
29/03/2019
Decision Description:
CONSTRUCTION OF WINDFARM, CONSISTING OF 15 WIND TURBINES OF UP TO 3MW CAPACITY EACH OF UP TO 85M HUB HEIGHT AND UP TO 100M BLADE DIAMENTER WITH A TOTAL HEIGHT NOT EXCEEDING 135M, A PERMANENT METEOROLOGICAL LOGICAL LATTICE MAST 85M HIGH, A SUBSTATION AND ASSOCIATED EQUIPMENT, A BORROW PIT, INERNAL SITE TRACKS, SITE DRAINAGE AND ASSOCIATED WORKS
CONSTRUCTION OF WINDFARM, CONSISTING OF 15 WIND TURBINES OF UP TO 3MW CAPACITY EACH OF UP TO 85M HUB HEIGHT AND UP TO 100M BLADE DIAMENTER WITH A TOTAL HEIGHT NOT EXCEEDING 135M, A PERMANENT METEOROLOGICAL LOGICAL LATTICE MAST 85M HIGH, A SUBSTATION AND ASSOCIATED EQUIPMENT, A BORROW PIT, INERNAL SITE TRACKS, SITE DRAINAGE AND ASSOCIATED WORKS
A TEN YEAR PLANNING PERMISSION FOR THE CONSTRUCTION OF A 110kV ELECTRICITY SUBSTATION. THE PROPOSED DEVELOPMENT IS INTENDED TO REPLACE TWO SUBSTATIONS PREVIOUSLY PERMITTED AS PART OF THE DRUMAHOUGH WIND FARM (PL. REF. 08/50687 AND EXTENDED UNDER PL. REF. 13/51609) AND THE LENALEA WIND FARM (PL. REF. 09/50116). THE PROPOSED SUBSTATION INCLUDES 2 NO. CONTROL BUILDINGS, ASSOCIATED ELECTRICAL PLANT AND EQUIPMENT, UNDERGROUND ELECTRICITY CABLING, FENCING AND ALL ANCILLARY WORKS. THE PLANNING APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT STATEMENT