| File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
| 1280035 |
APPLICATION FINALISED |
PERMISSION |
C |
01/05/2012 Tuesday |
HEALTH SERVICE EXECUTIVE(NORTH WEST) |
LETTERKENNY GENERAL HOSPITAL KILMACRENNAN ROAD BALLYBOE, GLENCAR |
THE FOLLOWING WORKS: (A) REMOVAL OF THE EXISTING 6000 LITRE LIQUID OXYGEN STORAGE VESSEL (V.I.E), ASSOCIATED SERVICES, REINFORCED CONCRETE RETAINING WALL AND HARD STANDING AREA. (B) CONSTRUCTION OF A NEW RETAINING WALL, ACCESS STEPS, SERVICE YARD, ACCESS DOORS INTO THE EXISTING MEDICAL GASES PLANT ROOM AND ASSOCIATED LANDSCAPING, (C) CONSTRUCT 2NO. MEDICAL GAS MANIFOLD ROOMS, (D) REMOVAL AND RELOCATION OF EXISTING 2NO. LPG GAS STORAGE TANKS, CONCRETE BASE AND PERIMETER PALISADE FENCING, (E) ERECTION OF 2NO. 10,000 LITRE LIQUID OXYGEN TANKS (2.5M DIAMETER x 4.68M HIGH) WITH 4NO. EVAPORATORS AND SERVICES, MANIFOLD ROOM, PERIMETER PALISADE FENCING. LOADING BAY AND ALL ASSOCIATED SITE WORKS |
| 1380062 |
APPLICATION FINALISED |
PERMISSION |
C |
03/09/2013 Tuesday |
HEALTH SERVICES EXECUTIVE (HSE NORTH WEST) |
LETTERKENNY GENERAL HOSPITAL CIRCULAR ROAD LETTERKENNY |
DEVELOPMENT WHICH WILL CONSIST OF: (1) THE CONSTRUCTION OF A 1046m2 DEVELOPMENT COMPRISING A MEDICAL EDUCATION & TRAINING CENTRE TO PROVIDE AN ONSITE EDUCATIONAL FACILITY FOR STUDENT HEALTH CARE PROFESSIONALS (614m2 AT LEVELS 0 & 1). (2) AN EXTENSION TO EXISTING RENAL SERVICES AT LEVEL 2 (351m2). (3) A COVERED LINK TO THE MAIN HOSPITAL AT GROUND FLOOR LEVEL AND ASSOCIATED PLANT AT ROOF LEVEL (81m2). (4) THE RELOCATION OF AN EXISTING OIL TANK. (5) THE REINSTATEMENT OF 3NO. CARPARKING SPACES. THE DEVELOPMENT SHALL ALSO COMPRISE SITE DEVELOPMENT WORKS ASSOCIATED WITH CARPARKING, VEHICULAR & PEDESTRIAN CIRCULATION, HARD & SOFT LANDSCAPING AND CONNECTIONS TO EXISTING SITE SERVICES INFRASTRUCTURE |
| 1450690 |
INCOMPLETED APPLICATION |
PERMISSION |
|
12/06/2014 Thursday |
THE DONEGAL CLINICAL ACADEMY TRUST |
LETTERKENNY GENERAL HOSPITAL CIRCULAR ROAD LETTERKENNY PO |
REMOVAL OF 37 EXISTING CARPARKING SPACES AND THE CONSTRUCTION OF A 1052M2 MEDICAL EDUCATION & RESEARCH ACADEMY COMPRISING: 230 SEAT AUDITORIUM, RESEARCH LIBRARY, CLINICAL SKILLS RESEARCH LABS, RESEARCH EXHIBITION SPACES, RESEARCH OFFICES, RESEARCH TUTORIAL ROOMS AND A PLANT ROOM ON THE ROOF. THE DEVELOPMENT WILL ALSO CONSIST OF SITE DEVELOPMENT WORKS ASSOCIATED WITH CAR PARKING, VEHICULAR & PEDESTRIAN CIRCULATION HARD & SOFT LANDSCAPING AND CONNECTIONS |
| 1450776 |
APPLICATION FINALISED |
PERMISSION |
C |
27/06/2014 Friday |
DONEGAL CLINICAL ACADEMY TRUST |
LETTERKENNY GENERAL HOSPITAL CIRCULAR ROAD LETTERKENNY |
THE REMOVAL OF 37 EXISTING CARPARKING SPACES AND THE CONSTRUCTION OF A 1052m2 MEDICAL EDUCATION AND RESEARCH ACADEMY COMPRISING: 230 SEAT AUDITORIUM RESEARCH LIBRARY, CLINICAL SKILLS RESEARCH LABS, RESEARCH EXHIBITION SPACES, RESEARCH OFFICES, RESEARCH TUTORIAL ROOMS AND A PLANT ROOM ON THE ROOF. THE DEVELOPMENT WILL ALSO CONSIST OF SITE DEVELOPMENT WORKS ASSOCIATED WITH CAR PARKING, VEHICULAR & PEDESTRIAN CIRCULATION, HARD & SOFT LANDSCAPING AND CONNECTION TO EXISTING SITE SERVICES INFRASTRUCTURE. |
| 1750340 |
APPLICATION FINALISED |
PERMISSION |
C |
08/03/2017 Wednesday |
THE HEALTH SERVICE EXECUTIVE (HSE NORTH WEST) |
LETTERKENNY GENERAL HOSPITAL CIRCULAR ROAD LETTERKENNY |
PROVISION OF A NEW SMOKE VENTILATION WINDOW TO EXISTING STAIRCASE AT THIRD FLOOR LEVEL TO SOUTH FACADE OF RENAL SERVICES DEPARTMENT |