Planning application details ref: 1350064 Donegal County Council

100%100% Complete (warning)

Planning Application: 1350064 (Donegal County Council )
File Number: 1350064
Application Type: EXTENSION OF DURATION Planning Status: APPLICATION FINALISED
Received Date: 22/01/2013 Decision Due Date: 18/03/2013
Validated Date: 22/01/2013 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Decision Date: 07/03/2013
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By: 25/02/2013

Applicant Details

Applicant name: PAUL CURRID
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: DEVELOPMENT AT AND ADJOINING THE EXISTING HOUSING DEVELOPMENT KNOWN AS BLUE CEDARS, CAPPRY, BALLYBOFEY,CO. DONEGAL CONSISTING OF THE CONSTRUCTION OF 8 NO. APARTMENTS AND 27 NO. DWELLING HOUSES, A CRECHE BUILDING, TENNIS COURT AND LANDSCAPED OPEN SPACE AS FOLLOWS; DEMOLITION OF EXISTING DERELICT DWELLING HOUSE AND OUTBUILDINGS, CONSTRUCTION OF 1 NO. 2 STOREY APARTMENT BLOCK WITH 8 TWO BEDROOM APARTMENTS, 8 NO. 2 STOREY TERRACED DWELLING HOUSES, 12 NO. TWO STOREY SEMI-DETACHED DWELLING HOUSES AND 3 NO. SINGLE STOREY DWELLING HOUSES; 4 NO. TWO STOREY DETACHED DWELLING HOUSES. CONSTRUCTION OF A PART TWO STOREY / PART SINGLE STOREY CRECHE BUILDING TO CATER FOR APPROXIMATELY 50 CHILDREN WITH STAFF CAR PARK AND DROP OFF AREA, CONSTRUCTION OF AN ALL WEATHER FINISHED TENNIS COURT AND LANDSCAPED COMMUNAL OPEN SPACE. ALL OF THE ABOVE TO INCLUDE PROVISION OF ALL ASSOCIATED SITE DEVELOPMENT WORKS AND CONNECTION TO THE EXISTING FOUL AND STORM WATER DRAINAGE NETWORKS AND CONNECTION TO ALL OTHER SERVICES INCLUDING THE ROAD AND FOOTPATH NETWORK AS CONSTRUCTED ON SITE TO INCLUDE PROVISION OF VEHICULAR ACCESS VIA THE EXISTING BLUE CEDARS ESTATE ROAD TO DISCHARGE ONTO THE COUNTY ROAD AT THE EXISTING JUNCTION
Development Address: CAPPRY , BALLYBOFEY , LIFFORD PO , CO. DONEGAL
Architect Name: Location Key: CAPPRY
Electoral Division: Dooish Planner: None
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 07/03/2013 Manager Order: 2013PH0406
Decision Type: Number of Conditions: 0
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 03/02/2018
Decision Description: DEVELOPMENT AT AND ADJOINING THE EXISTING HOUSING DEVELOPMENT KNOWN AS BLUE CEDARS, CAPPRY, BALLYBOFEY,CO. DONEGAL CONSISTING OF THE CONSTRUCTION OF 8 NO. APARTMENTS AND 27 NO. DWELLING HOUSES, A CRECHE BUILDING, TENNIS COURT AND LANDSCAPED OPEN SPACE AS FOLLOWS; DEMOLITION OF EXISTING DERELICT DWELLING HOUSE AND OUTBUILDINGS, CONSTRUCTION OF 1 NO. 2 STOREY APARTMENT BLOCK WITH 8 TWO BEDROOM APARTMENTS, 8 NO. 2 STOREY TERRACED DWELLING HOUSES, 12 NO. TWO STOREY SEMI-DETACHED DWELLING HOUSES AND 3 NO. SINGLE STOREY DWELLING HOUSES; 4 NO. TWO STOREY DETACHED DWELLING HOUSES. CONSTRUCTION OF A PART TWO STOREY / PART SINGLE STOREY CRECHE BUILDING TO CATER FOR APPROXIMATELY 50 CHILDREN WITH STAFF CAR PARK AND DROP OFF AREA, CONSTRUCTION OF AN ALL WEATHER FINISHED TENNIS COURT AND LANDSCAPED COMMUNAL OPEN SPACE. ALL OF THE ABOVE TO INCLUDE PROVISION OF ALL ASSOCIATED SITE DEVELOPMENT WORKS AND CONNECTION TO THE EXISTING FOUL AND STORM WATER DRAINAGE NETWORKS AND CONNECTION TO ALL OTHER SERVICES INCLUDING THE ROAD AND FOOTPATH NETWORK AS CONSTRUCTED ON SITE TO INCLUDE PROVISION OF VEHICULAR ACCESS VIA THE EXISTING BLUE CEDARS ESTATE ROAD TO DISCHARGE ONTO THE COUNTY ROAD AT THE EXISTING JUNCTION

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: