(1) DEMOLITION OF 3NO. DWELLING HOUSES AND OUT-BUILDINGS (2) CONSTRUCTION OF PETROL FILLING STATION TO INCLUDE PETROL PUMPS, CANOPY, UNDERGROUND FUEL STORAGE TANKS, VENTS, CAR WASH, SIGNAGE, CAR PARKING AND ALL ASSOCIATED WORKS (3) ERECTION OF 2 STOREY MIXED USE BLOCK CONTAINING SHOP, DELI AND ANCILLARY ACCOMMODATION ASSOCIATED WITH THE PETROL FILLING STATION ON GROUND FLOOR WITH RESTAURANT ON FIRST FLOOR AND ASSOCIATED STORAGE, KITCHEN AND STAFF FACILITIES (4) CONSTRUCTION OF NEW ENTRANCE (5) CONNECTION TO EXISTING PUBLIC DRAINAGE SYSTEM (6) ALL ASSOCIATED SITE WORKS
NEW FORECOURT CANOPY AND REVISED FORECOURT LAYOUT TO INCLUDE 4 NO. ADDITIONAL FUEL PUMPS WITHIN DEVELOPMENT PREVIOUSLY GRANTED UNDER PLANNING REF. NO. 08/40441
(1) THE CREATION OF A NEW VEHICULAR EXIT TO SERVE THE EXISTING SERVICE STATION, (2) A SCREEN WALL AND ENHANCED BUFFER TREATMENT ALONG THE SOUTH -EASTERN SITE BOUNDARY AND (3) RETENTION OF SERVICE STATION LAYOUT INCORPORATING (A) AN EXTENDED PAVED AREA, (B) 4 ADDITIONAL PUMP ISLANDS, (C) AMENDED CAR PARKING AND INTERNAL TRAFFIC LANES, (D) CAR WASH FACILITY AND EQUIPMENT STORE, (E) A STORAGE SHED, (F) UNDERGROUND RAIN WATER HARVESTING TANK, (G) CANOPY AND SHOP POSITION (H) TWO STEEL MESH CONTAINERS AND A SINGLE PLASTIC CONTAINER AND (I) A FILLING STATION SIGN
DEVELOPMENT CONSISTING OF (1) (i) THE CREATION OF A NEW VEHICULAR EXIT TO SERVE THE EXISTING SERVICE STATION AND (ii) A SCREEN WALL AND ENHANCED BUFFER TREATMENT ALONG THE SOUTH-EASTERN SITE BOUNDARY (2) RETENTION OF THE SERVICE STATION LAYOUT INCORPORATING (i) AN EXTENDED PAVED AREA (ii) 4 ADDITIONAL PUMP ISLANDS (iii) AMENDED CAR PARKING AND INTERNAL TRAFFIC LANES (iv) CAR WASH FACILITY AND EQUIPMENT STORE (v) A STORAGE SHED (vi) UNDER-GROUND RAIN WATER HARVESTING TANK (vii) CANOPY AND SHOP POSITION (viii) TWO STEEL MESH CONTAINERS AND A SINGLE PLASTIC CONTAINER (ix) A FILLING STATION SIGN AND A (x) KIOSK SERVING THE FORECOURT
No Environment Impact Assesments Associated with this Application