Planning Application: 1651324 (Donegal County Council )
File Number:
1651324
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
08/09/2016
Decision Due Date:
02/11/2016
Validated Date:
08/09/2016
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
20/10/2016
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
12/10/2016
Applicant Details
Applicant name:
SEAQUEST ENGINEERING LTD
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
(1) SITE WORKS INCLUDING REDUCED LEVEL EXCAVATIONS TO PROVIDE SUITABLE LEVELS FOR THE BUILDING, VEHICULAR ACCESS & CIRCULATION. THE EXCAVATION WORK MAY NECESSITATE ROCK BREAKING USING A CONTROLLED BLASTING TECHNIQUE IN CONJUNCTION WITH MECHANICAL ROCK BREAKING ACTIVITY. THE WORKS WILL NECCESSITATE STOCKPILING OF EXCAVATED ROCK MATERIAL ON SITE (2) SINGLE STOREY EXTENSION TO EXISTING MANUFACTURING WORKSHOP (3) CONSTRUCTION OF A SINGLE STOREY DETACHED WORKSHOP BUILDING. (4) ASSOCIATED SITE WORKS INCLUDING EXTENSION OF EXISTING HARD SURFACED YARD AND BOUNDARY FENCE
Development Address:
INDUSTRIAL ROAD , KILLYBEGS , DONEGAL PO , CO. DONEGAL
Architect Name:
Location Key:
KILLYBEGS
Electoral Division:
Killybegs
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision code updated to Conditional from part grant\refuse during iPlan 5 upgrade
(1) SITE WORKS INCLUDING REDUCED LEVEL EXCAVATIONS TO PROVIDE SUITABLE LEVELS FOR THE BUILDING, VEHICULAR ACCESS & CIRCULATION. THE EXCAVATION WORK MAY NECESSITATE ROCK BREAKING USING A CONTROLLED BLASTING TECHNIQUE IN CONJUNCTION WITH MECHANICAL ROCK BREAKING ACTIVITY. THE WORKS WILL NECCESSITATE STOCKPILING OF EXCAVATED ROCK MATERIAL ON SITE (2) SINGLE STOREY EXTENSION TO EXISTING MANUFACTURING WORKSHOP (3) CONSTRUCTION OF A SINGLE STOREY DETACHED WORKSHOP BUILDING. (4) ASSOCIATED SITE WORKS INCLUDING EXTENSION OF EXISTING HARD SURFACED YARD AND BOUNDARY FENCE
ROCK BREAKING USING A CONTROLLED BLASTING TECHNIQUE TO ENABLE DEVELOPMENT ALREADY GRANTED PLANNING PERMISSION REF. NO. 11/20291 CONSISTING OF A MANUFACTURING WORKSHOP AND STORE WITH ANCILLARY ACCOMODATION AND ASSOCIATED SITR WORKS
DEVELOPMENT ADDITIONAL TO THAT APPROVED UNDER PLANNING PERMISSION REF. NO. 11/20291. 1. 2NO. ADDITIONAL BAYS TO WORK SHOP SPACE. 2. ADDITIONAL STORAGE MEZZANINE IN WORKSHOP BUILDING. 3. REVISED FIRST FLOOR LAYOUT IN WORKSHOP BUILDING. 4. ADDITIONAL BAY TO PAINT SHOP BUILDING.5. RELOCATION OF ESB SUBSTATION AND PROVISION OF PLANT ROOM. 6. EXTERNAL FUEL STORAGE COMPOUND.
EXTENSION AND MODIFICATION OF SINGLE STOREY DETACHED WORKSHOP APPROVED UNDER PERMISSION REF. NO. 16/51324 AND THE RELOCATION OF ENTRANCE APPROVED UNDER PERMISSION REF. NO. 11/20291
(1) CONSTRUCTION OF A SINGLE STOREY EXTENSIONS TO EXISTING MANUFACTURING WORKSHOP CONSISTING OF ADDITIONAL WORKSHOP SPACE, STAFF CANTEEN AND CHANGING FACILITITES (2) SITE WORKS INCLUDING THE INSTALLATION OF A PROPRIETARY STORM WATER ATTENUATION SYSTEM TO REPLACE THE EXISTING SWALE ATTENUATION ARRANGEMENT