1. CONSTRUCTION OF NEW ENTRANCE TO THE FRONT WITH NEW FRONT FACADE ONTO MAIN STREET, EXTENSION TO THE SIDE FOR A DISABLED TOILET, EXTENSION TO THE SIDE FOR STAIRS AND TOILETS. EXTENSION TO THE REAR FOR DELIVERY STAIRS TO KITCHEN 2. CHANGE STORE AREA ON FIRST FLOOR TO A KITCHEN AREA 3. CHANGE SNOOKER ROOM TO FORM PART OF BAR AREA & TOILETS AND LOWER THE FLOOR LEVEL 4. CHANGE EXISTING KITCHEN AND LIVING ROOM ON GROUND FLOOR TO FORM PART OF BAR AREA 5. AN EXTENSION OF THE ROOF SPACE AT THE REAR FOR KITCHEN USE 6. INSTALL VELUX ROOF LIGHTS TO KITCHEN AREA 7. NEW SIGNAGE.
DEMOLITION OF EXISTING 2 STOREY TOWN HOUSE AND BUILD A 3 STOREY MIXED USE DEVELOPMENT CONSISTING OF 2 RETAIL UNITS AT GROUND FLOOR LEVEL, OPEN PLAN OFFICE SPACE ON BOTH THE FIRST FLOOR AND SECOND FLOOR LEVELS WITH CONNECTION TO EXISTING PUBLIC STORM SEWER SYSTEM AND PUBLIC FOUL SEWER SYSTEM TOGETHER WITH CAR PARKING PROPOSALS
CHANGE OF USE FROM A TWO STOREY DWELLING HOUSE TO A HOT FOOD TAKEAWAY ON THE GROUND FLOOR LEVEL ONLY. THE DEVELOPMENT WILL CONSIST OF THE CONSTRUCTION OF HOT FOOD TAKE AWAY AT GROUND FLOOR LEVEL WITH CONNECTION TO EXISTING PUBLIC STORM SEWER SYSTEM AND PUBLIC FOUL SEWER SYSTEM TOGETHER WITH CAR PARKING PROPOSALS AND ASSOCIATED SITE WORKS
AMENDMENTS TO AN EXISTING PLANNING APPROVAL NAMELY 09/30290 CONSISTING OF AN INCREASED SIZE OF THE REAR TWO STOREY PROJECTION AND PROVISIONS FOR ACCESS FOR THE FOOT PATH TO THE WESTERN SIDE OF THE DWELLING HOUSE