1550968 |
APPLICATION FINALISED |
PERMISSION |
C |
30/07/2015 Thursday |
LETTERGULL ENERGY SUPPLY LTD |
LISTILLION, LURGY, KNOCKBRACK, AGHLEHARD, TREANAVINNY, GLENMAQUIN LOWER, KINCRAIGY, ROOSKEY, LISCLAMERTY, CARRICKNAMART, MONDOOEY UPPER, MONDOOEY MIDDLE, BALLYHOLEY FAR, DRUMATOLAND, SHESKINAPOLL, CARRICKADAWSON, WOODLAND AND MOMEEN LETTERKENNY CO DONEGAL |
CONSTRUCTION OF A NEW ELECTRICITY OVERHEAD POWER LINE WITH ASSOCIATED POLES, MASTS, UNDERGROUND CABLING, SITE WORKS AND ALL ANCILLARY DEVELOPMENT, FOR A 38KV GRID CONNECTION TO LINK THE CONSENTED LETTERGULL WIND FARM, MOMEEN AND LETTERGULL TOWNLANDS, RAPHOE WITH THE EXISTING LETTERKENNY 110KV SUBSTATION IN LISTILLION TOWNLAND, LETTERKENNY. THE POWER LINE WILL BE APPROXIMATELY 10.16 KILOMETRES LONG. ALL STRUCTURES RANGE IN HEIGHT FROM 12 METRES TO 19 METRES. THE MAJORITY OF THE OVERHEAD LINE STRUCTURES ARE WOODEN POLE SETS; INCLUDING 5 STEEL MAST STRUCTURES. THE ELECTRICITY POWER LINE WILL BE OVERHEAD EXCEPT FOR SHORT SECTIONS ALONG THE FOLLOWING ROAD SECTIONS; N13-8 LISTILLION TOWNLAND (TD.), L-5794-1 LISTILLION TD., L-5634-2 KINCRAIGY TD., L-5644-1 ROOSKEY TD. AND L-5664-1 ROOSKEY TD. WHERE IT IS TO BE LAID UNDERGROUND. THE PROPOSED POWER CABLE WILL TRAVERSE THE FOLLOWING TOWNLANDS (FROM SUBSTATION TO CONSENTED WIND FARM SITE); LISTILLION TD, LURGY TD, KNOCKBRACK TD, AGHLEHARD TD, TREANAVINNY TD, GLENMAQUIN LOWER TD (PART UNDERGROUND) KINCRAIGY TD (PART UNDERGROUND), ROOSKEY TD (PART UNDERGROUND), LISCLAMERTY TD, CARRICKNAMART TD, MONDOOEY UPPER TD, MONDOOEY MIDDLE TD, BALLYHOLEY FAR TD, DRUMATOLAND TD, SHESKINAPOLL TD, CARRICKADAWSON TD, WOODLAND TD AND MOMEEN TD (PART UNDERGROUND) |
2561152 |
NEW APPLICATION |
PERMISSION |
|
07/07/2025 Monday |
|
LISTELLIAN LETTERKENNY CO. DONEGAL |
A PERIOD OF 10 YEARS FOR DEVELOPMENT AT THE EXISTING ESB NETWORKS 110KV LETTERKENNY SUBSTATION WHICH WILL CONSIST OF: (1) SOUTHWARD EXTENSION OF THE EXISTING ESB NETWORKS 110KV SUBSTATION COMPOUND BY 0.9HA, (2) CONSTRUCTION OF A 110 KV (KILOVOLT) GAS INSULATED SWITCHGEAR (GIS) BUILDING (APPROXIMATELY 82.5M BY 18.5M) MAXIMUM HEIGHT 18.0M, TO REPLACE THE EXISTING 110KV AIR INSULATED SWITCHGEAR (AIS) SUBSTATION, (3) CONSTRUCTION OF 5 NO. 110 KV LINE CABLE INTERFACE MASTS (LCIMS) TO THE SOUTH AND SOUTH-WEST OF THE EXISTING AIS SUBSTATION COMPOUND AND PROPOSED REPLACEMENT GIS BUILDING, WHICH WILL COMPRISE THE END POINT OF THE EXISTING OVERHEAD LINE CIRCUITS ACCESSING THE PROPOSED GIS BUILDING, (4) CONNECTION OF EXISTING TRANSMISSION CIRCUITS TO THE PROPOSED GIS BUILDING BY WAY OF UNDERGROUND CABLES FROM THE NEW LCIMS, (5) DECOMMISSIONING AND REMOVAL OF 7 NO. EXISTING 110 KV TOWERS AND 3 NO. 110KV H POLES, CABLING, BUSBARS, SWITCHGEARS AND SUPPORT STRUCTURES, (5) ERECTION OF 3 NO. LIGHTNING MASTS AT 11M HIGH AT THE REPLACEMENT GIS COMPOUND, (6) TEMPORARY WIDENING (31M) OF THE EXISTING (4M) FIELD GATE ENTRANCE OFF THE L1054 TO FACILITATE A TEMPORARY CONSTRUCTION ACCESS TRACK (204M), PERMANENT ACCESS TO THE DEVELOPMENT WILL CONTINUE AS EXISTING FROM THE SUBSTATION ENTRANCE OFF THE N13 AND (7) ALL ASSOCIATED AND ANCILLARY WORKS, INCLUDING ASSOCIATED GROUND CABLING AND EARTHGRID, 5 NO. CAR PARKING SPACES, SURFACE WATER DRAINAGE, UNDERGROUND WASTEWATER STORAGE TANK, LIGHTING, LANDSCAPING AND BOUNDARY TREATMENT, SITE PREPARATION, SITE CLEARANCE AND LEVELLING, PROVISION OF HARDSTANDING, PERMANENT INTERNAL ACCESS ROAD (505M), 1 NO. TEMPORARY CONSTRUCTION COMPOUND AND 1 NO. TEMPORARY LAYDOWN AREA WITH 20 NO. TEMPORARY CAR PARKING SPACES AND ALL ANCILLARY WORKS, ON AN OVERALL SITE AREA OF 9.3HA. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION |