Planning Application: 2251038 (Donegal County Council )
File Number:
2251038
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
15/06/2022
Decision Due Date:
09/08/2022
Validated Date:
15/06/2022
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
04/08/2022
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
19/07/2022
Applicant Details
Applicant name:
ALLISTER JOHNSTON
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
ERECTION OF AN EXTENSION TO EXISTING BAPTIST CHURCH CONSISTING OF A SINGLE STOREY 61.2M2 PREFABRICATED ROOM TOGETHER WITH ALL ASSOCIATED SITE WORKS AND INCLUDING CONNECTION TO EXISTING PUBLIC FOUL SEWER AND WATER MAINS
Development Address:
BAPTIST CHURCH, PORT ROAD, LETTERKENNY PO, CO. DONEGAL
Architect Name:
Location Key:
PORT ROAD
Electoral Division:
Letterkenny Rural
Planner:
Elaine McEntee
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
04/08/2022
Manager Order:
2022PH1982
Decision Type:
Conditional
Number of Conditions:
8
Grant Date:
08/09/2022
Grant Managers Order #:
2022PH1982
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
07/09/2027
Decision Description:
ERECTION OF AN EXTENSION TO EXISTING BAPTIST CHURCH CONSISTING OF A SINGLE STOREY 61.2M2 PREFABRICATED ROOM TOGETHER WITH ALL ASSOCIATED SITE WORKS AND INCLUDING CONNECTION TO EXISTING PUBLIC FOUL SEWER AND WATER MAINS
(1) DEMOLITION OF ALL EXISTING PROPERTIES ON SITE INCLUDING GLENEANY HOUSE, A CHURCH AND ASSOCIATED BOOK SHOP AND THE SITE OF A CAR RENTAL BUSINES, (2) ZONE 1: CONSTRUCTION OF (A) A NEW PUBLIC REALM TO THE FRONT OF THE NEW PROPERTIES ON PORT AND PEARSE ROAD INCLUDING ALL LANDSCAPING AND PUBLIC LIGHTING FEATURES, (3) ZONE 2: CONSTRUCTION OF SIX-STOREY BUILDING BLOCK FRONTING PORT ROAD COMPRISING OF THE FOLLOWING USES: (A) A MIXED-USE DEVELOPMENT AT GROUND FLOOR LEVEL CONSISTING OF OFFICE AND RETAIL FLOOR SPACE, (B) OFFICE SPACE AT FIRST AND SECOND FLOOR LEVEL, (C) OFFICE SPACE AND 4 NO. TWO-BEDROOM APARTMENTS AT THIRD FLOOR LEVEL TO INCLUDE PRIVATE OPEN SPACE AMENITIES TO THE APARTMENTS, (D) A RESTAURANT/CAFÉ AND 4 NO. TWO-BEDROOM APARTMENTS AT FOURTH FLOOR LEVEL TO INCLUDE PRIVATE OPEN SPACE AMENITIES TO THE APARTMENTS AND (E) A RESTAURANT WITH AN EXTERNAL DINING TERRACE AND TWO NO. TWO-BEDROOM APARTMENTS TO INCLUDE PRIVATE OPEN SPACE AMENITIES AT FIFTH FLOOR LEVEL, (4) ZONE 3: CONSTRUCTION OF A FOUR-STOREY BUILDING FRONTING PEARSE ROAD CONSISTING OF: (A) A TOYOTA MOBILITY CENTRE PLUS RECEPTION AREA FOR PROPOSED STUDENT ACCOMMODATION AT GROUND FLOOR LEVEL, (B) 45 NO. STUDENT ACCOMMODATION BEDROOMS AT FIRST, SECOND AND THIRD FLOOR LEVELS WITH DAY ROOMS AND (C) A GLAZED LINK FROM FIRST, SECOND AND THIRD FLOORS TO ZONE 5,
No Environment Impact Assesments Associated with this Application