Planning Application: 2251734 (Donegal County Council )
File Number:
2251734
Application Type:
RETENTION PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
17/10/2022
Decision Due Date:
22/03/2023
Validated Date:
17/10/2022
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
08/12/2022
Decision Type:
Refused
Decision Date:
16/03/2023
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
20/11/2022
Applicant Details
Applicant name:
KEITH AND KELSEY HARKIN
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
(1) 2 NO. GLAMPING PODS, 2 NO. HOT TUBS, DECKING AREAS AND CAR PARKING (2) CHANGE OF USE OF OUTBUILDING TO TOILETS AND A SHOWER BLOCK (3) EXTENSION TO EXISTING OUTBUILDING FOR DOMESTIC USE AND CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS
Development Address:
GLACK OR BOHULLION, INCH, CO. DONEGAL
Architect Name:
Location Key:
GLACK OR BOHULLION
Electoral Division:
Inch
Planner:
Sophie Devlin
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
16/03/2023
Manager Order:
2023PH0484
Decision Type:
Refused
Number of Conditions:
4
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
Decision Description:
(1) 2 NO. GLAMPING PODS, 2 NO. HOT TUBS, DECKING AREAS AND CAR PARKING (2) CHANGE OF USE OF OUTBUILDING TO TOILETS AND A SHOWER BLOCK (3) EXTENSION TO EXISTING OUTBUILDING FOR DOMESTIC USE AND CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS
(A) 2 NO. GLAMPING PODS, 2 NO. HOT TUBS, DECKING AREAS AND CAR PARKING, (B) CHANGE OF USE OF OUTBUILDING TO TOILETS AND A SHOWER BLOCK, AND (C) EXTENSION TO EXISTING OUTBUILDING FOR DOMESTIC USE AND PERMISSION FOR (A) DECOMMISSIONING OF EXISTING SEPTIC TANK AND (B) INSTALLATION OF NEW WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS
(1) TWO ECO PODS, (2) EXTENSION TO OUTBUILDING FOR A GUEST TOILET AND WASHROOM, (3) EXTENSION TO OUTBUILDING FOR A DOMESTIC TOOL SHED, (4) CHANGE OF USE OF AN OUTBUILDING LOUNGE FROM DOMESTIC TO GUEST USE, (5) CHANGE OF USE OF OUTBUILDING UTILITY ROOM TO KITCHENETTE FOR GUEST USE, (6) COVERED CANOPY GUEST SEATING AREA, (7) PARTIAL REINSTATEMENT OF SHED ROOF IN DOMESTIC YARD AND (8) PATHWAY, DECKING AND SIGNAGE AND PERMISSION FOR (1) DECOMMISSIONING OF EXISTING SEPTIC TANK, (2) INSTALLATION OF NEW WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS, (3) GUEST PARKING FOR THREE CARS, (4) CONSTRUCTION OF BIKE SHED AND (5) RAINWATER HARVESTING INFRASTRUCTURE AND TANKS
No Environment Impact Assesments Associated with this Application