File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
017650 |
APPLICATION FINALISED |
PERMISSION |
C |
19/12/2001 Wednesday |
MARTIN MAGEE |
CRANFORD QUARRY DEVLINMORE CARRIGART |
RETENTION OF EXISTING ACCESS, RELOCATION OF OFFICE, 2NO. SETTLEMENT PONDS AND BLASTING AREA |
057006 |
INCOMPLETED APPLICATION |
PERMISSION |
|
07/01/2005 Friday |
MARTIN MCGEE |
DEVLINMORE CRANFORD
|
A)CONTINUATION OF QUARRYING AND BLASTING USE AND RELATED WORKS AND RETENTION OF ALL STRUCTURES AND RELATED DEVELOPMENT (INCLUDING OFFICE, ACCESS, WHEEL WASH, SETTLEMENT AND WATER PONDS, LANDSCAPE BERMS, CRUSHING, SCREENING AND STONE WASHING EQUIPMENT, SEPTIC TANK AND STORAGE FACILITIES)-AS PREVIOUSLY APPROVED UNDER PLANNING REFS 99/3418 & 01/7650 AND B)FURTHER EXTENSION OF THE EXISTING QUARRYING AND BLASTING AREA FOR FURTHER QUARRYING AND BLASTING USE WITH ASSOCIATED WORKS AND ANCILLARY DEVELOPMENT INCLUDING NEW SETTLEMENT AND WATER PONDS |
057069 |
APPLICATION FINALISED |
PERMISSION |
C |
04/02/2005 Friday |
MARTIN MCGEE |
DEVLINMORE CRANFORD |
A)CONTINUATION OF QUARRYING AND BLASTING USE AND RELATED WORKS INCLUDING OFFICE, ACCESS, LANDSCAPE BERMS, CRUSHING, SCREENING AND STONE WASHING EQUIPMENT, SEPTIC TANK AND STORAGE FACILITIES)-AS PREVIOUSLY APPROVED UNDER PLANNING REFS 99/3418 & 01/7650 AND B) EXTENSION OF APPROVED QUARRYING AND BLASTING AREA FOR FURTHER QUARRYING AND BLASTING USE WITH ASSOCIATED WORKS AND ANCILLARY DEVELOPMENT INCLUDING TWO NEW SETTLEMENT PONDS AND C) RETENTION OF 3 NO SETTLEMENT PONDS AND 1 NO WATER SUPPLY POND, 1 NO OVERFLOW POND, OIL STORAGE, STORAGE CONTAINER AND WHEEL WASH. |
0651368 |
INCOMPLETED APPLICATION |
PERMISSION |
|
23/10/2006 Monday |
CASSIDY BROTHERS TOPMIX LTD. |
CRANFORD STONE QUARRY DEVLINMORE CRANFORD |
CONSTRUCTION OF CONCRETE BATCHING PLANT AND ASSOCIATED SITE WORKS |
0651517 |
APPLICATION FINALISED |
PERMISSION |
C |
27/11/2006 Monday |
CASSIDY BROTHERS TOPMIX LTD |
CRANFORD STONE QUARRY DEVLINMORE CRANFORD |
CONSTRUCTION OF CONCRETE BATCHING PLANT AND ASSOCIATED SITE WORKS |
0940336 |
APPLICATION FINALISED |
PERMISSION |
C |
12/10/2009 Monday |
MARTIN MCGEE |
CRANFORD STONE QUARRY DEVLINMORE CRANFORD |
A) CONTINUATION OF QUARRYING AND BLASTING USE AND RELATED WORKS INCLUDING OFFICE, LANDSCAPE BERMS, CRUSHING, SCREENING & STONE WASHING EQUIPMENT, SEPTIC TANK AND STORAGE FACILITIES AND 3 NO. SETTLEMENT PONDS, 1 NO. WATER SUPPLY POND, 1 NO. OVERFLOW POND, OIL STORAGE, STORAGE CONTAINER AND WHEEL WASH AS PREVIOUSLY APPROVED UNDER PLANNING REF NO. 05/7069 GRANTED 03/05/2005 (B) EXTENSION TO THE AREA FOR QUARRYING AND BLASTING USE TOTALLING 1.99 HECTARES, WITH ASSOCIATED WORKS AND ANCILLARY DEVELOPMENT (C) RETENTION AND COMPLETION OF 1 NO. SETTLEMENT POND. PERMISSION SOUGHT FOR 10 YEAR PERIOD |
1350841 |
APPLICATION FINALISED |
PERMISSION |
C |
19/06/2013 Wednesday |
MARTIN MCGEE |
DEVLINMORE CRANFORD LETTERKENNY PO |
A PROPOSED 0.32 HECTARE QUARRY EXTENSION TO PERMITTED CRANFORD STONE QUARRY (PREVIOUS PLANNING REFERENCE 09/40336) AND RELATED OPERATIONS INCLUDING BLASTING AND EXTRACTION WITH ALL ASSOCIATED SITE WORKS AND ANCILLARY DEVELOPMENT |
2050298 |
APPLICATION FINALISED |
PERMISSION |
C |
11/03/2020 Wednesday |
MARTIN MCGEE |
DEVLINMORE CRANFORD LETTERKENNY PO |
CONTINUATION OF THE EXISTING OPERATIONAL QUARRY FOR A 25-YEAR PERIOD. OPERATIONS WILL INCLUDE: 1) EXTRACTION, BLASTING AND ROCKING BREAKING WITHIN THE 2.62 HECTARES PREVIOUSLY PERMITTED QUARRYING AREA IN A DOWNWARD DIRECTION; 2) PROCESSING OF ROCK, SCREENING & WASHING OF MATERIAL INCLUDING SAND; 3) THE CONTINUATION OF USE OF ALL STRUCTURES AND OTHER ANCILLARY FACILITIES; 4) PROPOSED WATER TREATMENT PLANT TO CLEAN & RECYCLE WATER; 5) PREVIOUSLY PERMITTED SITE ACCESS AND 6) ALL RELATED OPERATION INCLUDING BLASTING AND EXTRACTION WITH ALL ASSOCIATED SITE WORKS; AND 7) ANCILLARY AND ASSOCIATED DEVELOPMENTS; ALL AT THE PERMITTED/OPERATIONAL QUARRY (PREVIOUS REFS: 09/40336, 13/50841 & 07/51043). A NATURA IMPACT STATEMENT ACCOMPANIES THIS APPLICATION |
2351505 |
APPLICATION FINALISED |
RETENTION PERMISSION |
C |
06/10/2023 Friday |
MARTIN MCGEE |
CRANFORD STONE QUARRY DEVLINMORE CRANFORD LETTERKENNY PO |
(1) EXISTING COMPOUND (FORMER BATCHING PLANT COMPOUND), (2) OFFICE BUILDING INCLUDING CONNECTION OF THE WASTE WATER DISCHARGE TO EXISTING APPROVED SEPTIC TANK, (3) ELECTRICAL CONTROL BUILDING INCLUDING THE ATTACHED STORE ROOM AND LIGHT POLE, (D) POND, AND (E) ENTRANCE INTO THE COMPOUND AND PERMISSION FOR (1) THE CONTINUED USE OF EXISTING COMPOUND AS A COMPOUND / STORAGE YARD FOR THE ADJOINING CRANFORD STONE QUARRY, (2) STAFF CAR PARKING WITHIN THE EXISTING COMPOUND, AND (3) DECOMMISSIONING OF EXISTING ON-SITE METAL CONTAINERS CONTAINING THE CURRENT SITE OFFICE AND CANTEEN |
2460456 |
INCOMPLETED APPLICATION |
PERMISSION |
|
04/04/2024 Thursday |
MARTIN MCGEE |
DEVLINMORE CRANFORD CO DONEGAL |
(1) RELOCATION OF THE SAND AND WASH PLANT FROM CURRENT QUARRY FLOOR TO THE EXISTING COMPOUND LEVEL (PREVIOUS PA REG. REFS. 20/50298 AND 23/51505 SCHEDULE B REFER), (2) DOWN-SIZING OF THE EXISTING PERMITTED ELECTRICAL CONTROL BUILDING, (3) REDUCTION OF GROUND LEVELS AT MAIN QUARRY ENTRANCE AND ACCESS ROAD INCLUDING RELOCATION OF WHEEL WASH AND WEIGH BRIDGE, (4) DEMARCATION OF CAR PARKING SPACES AT MAIN ENTRANCE AND ACCESSIBLE PARKING SPACE PROVIDED CLOSE TO THE EXISTING OFFICE BUILDING, (5) ALL ASSOCIATED AND RELATED SITE WORKS, OPERATIONS, ANCILLARY AND ASSOCIATED DEVELOPMENT WORKS |
93286 |
APPLICATION FINALISED |
PERMISSION |
C |
12/03/1993 Friday |
T.J. LOUGHLIN |
DEVLINMORE CARRIGART
|
RETENTION OF AND EXTENSION TO QUARRY |
993418 |
APPLICATION FINALISED |
PERMISSION |
C |
10/09/1999 Friday |
MARTIN MCGEE |
DEVLINMORE TD CARRIGART
|
CONTINUATION OF USE OF EXISTING QUARRY, EXT. TO SAME PROVISION OF MOBILE CRUSHING, WASHING & SCREENING PLANT, ALL ASSOC. DRAINAGE WORKS, SETTLEMENT PONDS, ETC & ERECTION OF WORKSHOP/STORAGE FACILITY, OFFICE WITH W.C. FACILITIES & SEPTIC TANK |