File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
1950357 |
APPLICATION FINALISED |
PERMISSION |
C |
19/03/2019 Tuesday |
SCOTTISH POWER RENEWABLES |
CULLIONBUOY BARNESMORE DONEGAL PO |
CONSTRUCTION OF A 6MW BATTERY ENERGY STORAGE SYSTEM (BESS) PROVIDED WITHIN A COMPOUND AREA CONSISTING OF ASSOCIATED PLANT, EQUIPMENT AND BUILDINGS INCLUDING : 2 NO. BESS CONTAINER BUILDINGS OF 2.6M IN HEIGHT, 12.2M IN LENGTH AND 2.5M IN WIDTH, 2 NO. TRANSFORMERS (EQUIPMENT) OF 2.5M IN HEIGHT, 2M IN LENGTH AND 2M IN WIDTH; A GRP SWITCHGEAR KIOSK (PLANT) OF 4.1M IN HEIGHT, 5.5M IN LENGTH AND 5.5M IN WIDTH; COMPOUND MESH FENCE OF 2.75M IN HEIGHT; AREA OF HARDSTANDING; 50M UNDERGROUND CABLE CONNECTING THE DEVELOPMENT TO THE EXISTING WINDFARM SUBSTATION; AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS TO FACILITATE THE DEVELOPMENT. ACCESS TO THE SITE WILL BE VIA THE EXISTING BARNESMORE WINDFARM PRIVATE LANEWAY WHICH ACCESSES ONTO THE LOCAL ROAD (L20151-1) WITHIN THE EXISTING BARNESMORE WINDFARM SITE |
1950390 |
APPLICATION FINALISED |
RETENTION PERMISSION |
C |
22/03/2019 Friday |
SCOTTISH POWER RENEWABLES UK LTD |
KEADEW UPPER CLOGHER DONEGAL PO |
A 70 METRE HIGH TEMPORARY METEOROLOGICAL MAST AND ALL ASSOCIATED WORKS FOR A PERIOD OF 21 MONTHS WITHIN THE EXISTING BARNESMORE WINDFARM SITE |
2050935 |
INCOMPLETED APPLICATION |
PERMISSION |
|
14/07/2020 Tuesday |
SCOTTISHPOWER RENEWABLES (UK) LTD. |
BARNESMORE WINDFARM SITE KEADOW UPPER CLOGHER, BARNESMORE |
UPGRADING OF EXISTING INFRASTRUCTURE TO PROVIDE AN EXTERNAL TRANSFORMER AT TURBINE NO.22 AT THE EXISTING BARNESMORE WINDFARM SITE, THE DEVELOPMENT WILL CONSIST OF UPGRADING OF EXISTING INFRASTRUCTURE INCLUDING A GRP TRANSFORMER ENCLOSURE HOUSING TRANSFORMER EQUIPMENT, TRANSFORMER PLINTH AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS. THE PROPOSED TRANSFORMER ENCLOSURE WILL BE 2 METRES IN HEIGHT, 3.55 METRES IN LENGTH AND 2.44 METRES IN WIDTH. THE TRANSFORMER ENCLOSURE WILL BE LOCATED ON A NEW TRANSFORMER CONCRETE PLINTH ON THE EXISTING WIND TURBINE HARD STAND AREA. DUCTING WILL BE INSTALLED BETWEEN THE PROPOSED PLINTH AND THE EXISTING TURBINE |
2051040 |
INCOMPLETED APPLICATION |
PERMISSION |
|
31/07/2020 Friday |
SCOTTISH POWER RENEWABLES (UK) LTD. |
BARNESMORE WINDFARM SITE CULLIONBUOY CLOGHER, BARNESMORE |
UPGRADING OF EXISTING INFRASTRUCTURE TO PROVIDE AN EXTERNAL TRANSFORMER AT TURBINE NO.22 AT THE EXISTING BARNESMORE WINDFARM SITE, THE DEVELOPMENT WILL CONSIST OF UPGRADING OF EXISTING INFRASTRUCTURE INCLUDING A GRP TRANSFORMER ENCLOSURE HOUSING, TRANSFORMER EQUIPMENT, TRANSFORMER PLINTH AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS. THE PROPOSED TRANSFORMER ENCLOSURE WILL BE 2 METRES IN HEIGHT, 3.55 METRES IN LENGTH AND 2.44 METRES IN WIDTH. THE TRANSFORMER ENCLOSURE WILL BE LOCATED ON A NEW TRANSFORMER CONCRETE PLINTH ON THE EXISTING WIND TURBINE HARD STAND AREA. DUCTING WILL BE INSTALLED BETWEEN THE PROPOSED PLINTH AND THE EXISTING TURBINE |
2051295 |
APPLICATION FINALISED |
PERMISSION |
C |
15/09/2020 Tuesday |
SCOTTISHPOWER RENEWABLES (UK) LTD. |
BARNESMORE WINDFARM SITE CULLIONBUOY BARNESMORE |
UPGRADING OF EXISTING INFRASTRUCTURE INCLUDING A GRP TRANSFORMER ENCLOSURE HOUSING TRANSFORMER EQUIPMENT, TRANSFORMER PLINTH AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS TO FACILITATE THE DEVELOPMENT. THE PROPOSED TRANSFORMER ENCLOSURE WILL BE 2 METRES IN HEIGHT, 3.55 METRES IN LENGTH AND 2.44 METRES IN WIDTH. THE TRANSFORMER ENCLOSURE WILL BE LOCATED ON A NEW TRANSFORMER CONCRETE PLINTH ON THE EXISTING WIND TURBINE HARD STAND AREA. DUCTING WILL BE INSTALLED BETWEEN THE PROPOSED PLINTH AND THE EXISTING TURBINE |
2150554 |
APPLICATION FINALISED |
RETENTION PERMISSION |
C |
30/03/2021 Tuesday |
SCOTTISHPOWER RENEWABLES LTD |
BARNESMORE WINDFARM SITE KEADOW UPPER CLOGHER |
70-METRE-HIGH TEMPORARY METEROLOGICAL MAST AND ALL ASSOCIATED WORKS FOR A PERIOD OF 3 YEARS |
941424 |
APPLICATION FINALISED |
PERMISSION |
C |
10/10/1994 Monday |
SURE ENGINEERING EUROPE LTD. |
CULLIONBOY, BARNESMORE
|
ERECTION OF A 40 METRE ANEMOMETER MAST |
994137 |
APPLICATION FINALISED |
PERMISSION |
C |
21/10/1999 Thursday |
CRE ENERGY LTD |
BARNESMORE WIND FARM
|
ERECTION OF 2 SITE INFORMATION BOARDS |