Planning Application: 21950 (Galway County Council )
File Number:
21950
Application Type:
EXTENSION OF DURATION
Planning Status:
APPLICATION FINALISED
Received Date:
01/06/2021
Decision Due Date:
26/07/2021
Validated Date:
01/06/2021
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Decision Date:
22/07/2021
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
05/07/2021
Applicant Details
Applicant name:
HTS Source Renewable Partners Ltd
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
for a solar farm development. The development will consist of (1) a solar PV panel array on ground mounted steel frames with a maximum export capacity of 5MW within an overall site area of 11.78ha (2) underground cabling/ducting (3) two electricity control buildings (4) temporary construction compound (5) site access including a temporary construction access and track from the L-4302-63 local road (6) boundary fencing and landscaping proposals (7) pole mounted infra red security cameras together with all associated site works and services.
Development Address:
Longford
Architect Name:
Location Key:
LONGFORD
Electoral Division:
Planner:
GRAINNE MCCONNELL
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
X
Comments:
Decision
Decision Date:
22/07/2021
Manager Order:
Decision Type:
Number of Conditions:
0
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
21/07/2026
Decision Description:
for a solar farm development. The development will consist of (1) a solar PV panel array on ground mounted steel frames with a maximum export capacity of 5MW within an overall site area of 11.78ha (2) underground cabling/ducting (3) two electricity control buildings (4) temporary construction compound (5) site access including a temporary construction access and track from the L-4302-63 local road (6) boundary fencing and landscaping proposals (7) pole mounted infra red security cameras together with all associated site works and services.
for a solar farm development. The development will consist of (1) a solar PV panel array on ground mounted steel frames with a maximum export capacity of 5MW within an overall site area of 11.78ha (2) underground cabling/ducting (3) two electricity control buildings (4) temporary construction compound (5) site access including a temporary construction access and track from the L-4302-63 local road (6) boundary fencing and landscaping proposals (7) pole mounted infra red security cameras together with all associated site works and services.
No Environment Impact Assesments Associated with this Application