Planning application details ref: 2261118 Galway County Council

100%100% Complete (warning)

Planning Application: 2261118 (Galway County Council )
File Number: 2261118
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 04/11/2022 Decision Due Date: 24/04/2023
Validated Date: 04/11/2022 Invalidated Date:
Further Info Requested: 06/01/2023 Further Info Received: 28/03/2023
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 21/04/2023
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By:

Applicant Details

Applicant name: Glann Mor Ceibh Teoranta
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: leasú a dhéanamh ar chead pleanála a fuarthas cheana féin (Pl. Ref: 18/1605 and An Bord Pleanála Tag: ABP-309759-21). Seo a leanas na leasuithe atá molta: i) Athrú ar limistéar teorann an tsuímh chun spás oscailte tírdhreachaithe a chur san áireamh ii) Athlonnú ar an Ionad Cóireála Fuíolluisce ar an suíomh le tírdhreachú bog mórthimpeall ar an Ionad iii) Leasú ar leagan amach páirceála caranna (spásanna páirceála breise do charranna agus do iv) Athruithe ar ingearchlónna an fhoirgnimh (athruithe fuinneoige, dorais, fuinneoige dín agus cumhdach san áireamh) agus arduithe ar leibhéil chríochnaithe an urláir v) Ceannbhrat nua thar an bpríomhdhoras isteach ar an ingearchló theas vi) Rochtain chéimithe agus rampaí isteach sa bhfoirgneamh oidhreachta ar an ingearchló thuaidh vii) Tírdhreachú crua agus bog athraithe, lena n-áirítear pábháil sheachtrach breise agus áiteanna suí taobh amuigh viii) Bealach isteach/amach éigeandála tánaisteach a sholáthar ó dheas den fhoirgneamh atá beartaithe ix) Athlonnú are an gcomharthaíocht eolais agus turasóireachta (ceadaithe cheana féin faoi Thag. Pl: 21/225), x) omharthaíocht Totem agus Cuaillí Bratacha molta, xi) Gach forbairt ghaolmhar agus choimhdeach ar an suíomh faoi chaibidil.Spás urláir comhlán na n-oibreacha beartaithe i m2 1236
Development Address: Barr an Doire, An Gleann Mór, An Cheathrú Rua
Architect Name: Location Key: BARR AN DOIRE
Electoral Division: Planner: Nicola Rose
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: 7 Comments:

Decision

Decision Date: 21/04/2023 Manager Order:
Decision Type: Conditional Number of Conditions: 24
Grant Date: 29/05/2023 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 30/03/2027
Decision Description: leasú a dhéanamh ar chead pleanála a fuarthas cheana féin (Pl. Ref: 18/1605 and An Bord Pleanála Tag: ABP-309759-21). Seo a leanas na leasuithe atá molta: i) Athrú ar limistéar teorann an tsuímh chun spás oscailte tírdhreachaithe a chur san áireamh ii) Athlonnú ar an Ionad Cóireála Fuíolluisce ar an suíomh le tírdhreachú bog mórthimpeall ar an Ionad iii) Leasú ar leagan amach páirceála caranna (spásanna páirceála breise do charranna agus do iv) Athruithe ar ingearchlónna an fhoirgnimh (athruithe fuinneoige, dorais, fuinneoige dín agus cumhdach san áireamh) agus arduithe ar leibhéil chríochnaithe an urláir v) Ceannbhrat nua thar an bpríomhdhoras isteach ar an ingearchló theas vi) Rochtain chéimithe agus rampaí isteach sa bhfoirgneamh oidhreachta ar an ingearchló thuaidh vii) Tírdhreachú crua agus bog athraithe, lena n-áirítear pábháil sheachtrach breise agus áiteanna suí taobh amuigh viii) Bealach isteach/amach éigeandála tánaisteach a sholáthar ó dheas den fhoirgneamh atá beartaithe ix) Athlonnú are an gcomharthaíocht eolais agus turasóireachta (ceadaithe cheana féin faoi Thag. Pl: 21/225), x) omharthaíocht Totem agus Cuaillí Bratacha molta, xi) Gach forbairt ghaolmhar agus choimhdeach ar an suíomh faoi chaibidil.Spás urláir comhlán na n-oibreacha beartaithe i m2 1236

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: