File Number: | 2360641 | ||
Application Type: | PERMISSION | Planning Status: | APPLICATION FINALISED |
Received Date: | 13/06/2023 | Decision Due Date: | 19/10/2023 |
Validated Date: | 13/06/2023 | Invalidated Date: | |
Further Info Requested: | 04/08/2023 | Further Info Received: | 22/09/2023 |
Withdrawn Date: | Extend Date: | ||
Decision Type: | Conditional | Decision Date: | 12/10/2023 |
Leave to Appeal: | Appeal Date: | ||
Commenced Date: | Submissions By: |
Applicant Details |
|||
---|---|---|---|
Applicant name: | Buffy Letter Limited | ||
Applicant Address: | |||
Phone Number: | Fax Number: | ||
Corresp. Address: |
Proposed Development |
|||
---|---|---|---|
Development Description: | for a 10-year permission for development at this site at Letter, Moycullen, Co. Galway. This site is located within a Gaeltacht area. The proposed development will consist of the provision of a synchronous condenser, enclosed within a building (12.5 metres high) with associated plant and apparatus, transformers, circuit breakers, modular electrical control containers, air compressor, cooling equipment, underground cabling (including 110kV connection to the adjacent Buffy substation (within Ardderroo Wind Farm), lightning protection poles, perimeter security fencing, drainage, landscaping, temporary construction compound, access tracks (new and upgrade of existing), all ancillary site development works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development. *** Tá sé ar intinn ag Buffy Letter Limited iarratas deich mbliana a dhéanamh ar chead chun forbairt a dhéanamh ag an suíomh seo Leitir, Maigh Cuilinn i gCo. na Gaillimhe. Tá an suíomhsuite i gceantar Gaeltachta. Is éard a bheidh san fhorbairt atá beartaithe ná comhdhlúthadán sioncronach a sholáthar, iata laistigh d’fhoirgneamh (12.5 méadar ar airde) le planda gaolmhar agus gaireas, claochladáin, scoradáin chiorcaid, coimeádáin rialaithe leictreach modúlach, comhbhrúiteoir aeir, trealamh fuaraithe, cáblaí faoi thalamh lena n-áirítear ceangal 110kV le fostáisiún Buffy in aice leis (laistigh de Ardderroo Wind Farm), cuaillí cosanta tintreach, fálú slándála imlíne, draenáil, tírdhreachú, bábhún tógála sealadach, rianta rochtana (nua agus uasghrádú atá ann cheana féin), gach obair fhorbartha choimhdeach ar an suíomh. Ullmhaíodh Ráiteas Tionchair Natura (NIS) i ndáil leis an bhforbairt atá beartaithe | ||
Development Address: | Letter, Moycullen, Co. Galway | ||
Architect Name: | Location Key: | LETTER MOYCULLEN | |
Electoral Division: | Planner: | Catherine Crawford | |
Social Housing Exempt: | Plan Enforcement #: | ||
IPC Licence Required: | No | Waste Licence Required: | No |
Protected Structure: | No | Protected Structure #: | |
Development Name: |
Comments |
|||
---|---|---|---|
Significant Case Flag: | 8 | Comments: | Also I and U |
Decision |
|||
---|---|---|---|
Decision Date: | 12/10/2023 | Manager Order: | |
Decision Type: | Conditional | Number of Conditions: | 13 |
Grant Date: | 20/11/2023 | Grant Managers Order #: | |
Section 47 Apply?: | Part 5 Apply?: | ||
Expiry Date: | 19/11/2033 | ||
Decision Description: | for a 10-year permission for development at this site at Letter, Moycullen, Co. Galway. This site is located within a Gaeltacht area. The proposed development will consist of the provision of a synchronous condenser, enclosed within a building (12.5 metres high) with associated plant and apparatus, transformers, circuit breakers, modular electrical control containers, air compressor, cooling equipment, underground cabling (including 110kV connection to the adjacent Buffy substation (within Ardderroo Wind Farm), lightning protection poles, perimeter security fencing, drainage, landscaping, temporary construction compound, access tracks (new and upgrade of existing), all ancillary site development works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development. *** Tá sé ar intinn ag Buffy Letter Limited iarratas deich mbliana a dhéanamh ar chead chun forbairt a dhéanamh ag an suíomh seo Leitir, Maigh Cuilinn i gCo. na Gaillimhe. Tá an suíomhsuite i gceantar Gaeltachta. Is éard a bheidh san fhorbairt atá beartaithe ná comhdhlúthadán sioncronach a sholáthar, iata laistigh d’fhoirgneamh (12.5 méadar ar airde) le planda gaolmhar agus gaireas, claochladáin, scoradáin chiorcaid, coimeádáin rialaithe leictreach modúlach, comhbhrúiteoir aeir, trealamh fuaraithe, cáblaí faoi thalamh lena n-áirítear ceangal 110kV le fostáisiún Buffy in aice leis (laistigh de Ardderroo Wind Farm), cuaillí cosanta tintreach, fálú slándála imlíne, draenáil, tírdhreachú, bábhún tógála sealadach, rianta rochtana (nua agus uasghrádú atá ann cheana féin), gach obair fhorbartha choimhdeach ar an suíomh. Ullmhaíodh Ráiteas Tionchair Natura (NIS) i ndáil leis an bhforbairt atá beartaithe |
Appeal Details | |||
---|---|---|---|
Notification Date: | BP Reference #: | ||
Appeal Type: | File Forward Date: | ||
Submission Due Date: | Submission Sent Date: | ||
Appeal Decision: | Decision Date: | ||
Withdrawn Date: | Dismissed Date: | ||
Reason: |