07547 |
APPLICATION FINALISED |
RETENTION |
C |
18/07/2007 Wednesday |
William Greaney |
Ballybrit Business Park Ballybrit Galway |
Permission to retain E.S.B. substation attached to block 7 |
07834 |
APPLICATION FINALISED |
PERMISSION |
C |
31/10/2007 Wednesday |
American Power Conversion (APC) |
Ballybrit Business Park Ballybrit Galway |
Permission for development to consist of minor alterations to fenestration previously granted under Pl. Ref. 01/95, construction of a ground floor enclosed walkway between units 8 and 8A, a covered walkway and lobby between units 8 and 7, escape stairs to units 8 and 8A, entrance lobby and ramp to unit 7, bicycle shelter, smoke shelter and service yard together with all associated site works and services |
08190 |
INVALID APPLICATION |
PERMISSION |
|
20/03/2008 Thursday |
American Power Conversion Corporation (APC-MGE) |
Ballybrit Business Park Ballybrit Galway |
Permission for development which will consist of the erection of illuminated signage to the south and west elevations of unit 7, together with all associated site works and services |
08289 |
APPLICATION FINALISED |
PERMISSION |
C |
01/05/2008 Thursday |
American Power Conversion Corporation (APC-MGE) |
Unit 7 Ballybrit Business Park Ballybrit |
Permssion for the development to consist of the erection of illuminated signage to the south and west elevations, together with all associated site works and services |
08369 |
APPLICATION FINALISED |
PERMISSION |
R |
05/06/2008 Thursday |
American Power Conversion Corporation (APC-MGE) |
Ballybrit Business Park Ballybrit Galway |
Permission for development which will consist of the erection of 3 no. 8 metre high flag poles together with all associated site works |
08617 |
APPLICATION FINALISED |
RETENTION |
C |
02/10/2008 Thursday |
American Power Conversion (APC-MGE) Schneider Electric |
Ballybrit Business Park Ballybrit Galway |
Permission for retention of development which consists of a cold room and freezer room single storey extension to the ground floor of Unit 08 and associated site works and services |
08639 |
APPLICATION FINALISED |
PERMISSION |
C |
17/10/2008 Friday |
John Dooley |
Ballybrit Business Park Ballybrit Galway |
Permission for the provision of a specialist office block. The proposed development consists of a four storey office building which is being provided over basement car parking. The development includes hard and soft external landscaping, a substation, and all associated site works, services and car parking |
1132 |
APPLICATION FINALISED |
PERMISSION |
C |
16/02/2011 Wednesday |
Cathal Greaney |
Ballybrit Business Park Ballybrit Galway |
Permission to construct new link corridor at ground floor level between block 5 and block 6 |
21319 |
APPLICATION FINALISED |
PERMISSION |
C |
28/09/2021 Tuesday |
Neuravi Ltd |
Unit 6 Ballybrit Business Park Galway |
Permission for development which will consist of the erection of signage to the south elevation, together with all associated site works and services |
FS14707 |
APPLICATION FINALISED |
APPROVAL |
C |
25/09/2007 Tuesday |
American Power Conversion Corporation |
Unit 7, Ballybrit Business Park, Galway. |
Material alteration to a three storey office building, with material change of use which will consist of a mixture of cellular offices, open plan office areas & meeting rooms. |
FS15707 |
APPLICATION FINALISED |
APPROVAL |
C |
18/10/2007 Thursday |
American Power Conversion Corporation |
Unit 8A Ballybrit Business Park Galway. |
Material alteration |