Planning application details ref: 06129 Galway City Council

100%100% Complete (warning)

Planning Application: 06129 (Galway City Council)
File Number: 06129
Application Type: RETENTION Planning Status: APPLICATION FINALISED
Received Date: 17/02/2006 Decision Due Date: 13/04/2006
Validated Date: 17/02/2006 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 05/04/2006
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By:

Applicant Details

Applicant name: Castlehope Limited
Applicant Address:
Phone Number: Fax Number: 01 - 873 3084
Corresp. Address:

Applicant Details


Proposed Development

Development Description: Permission granted for omission of part ground floor area and glazing set back on curved southern corner to provide covered entry to the retail; and provision of additional doors at ground floor to retail level approved under Ref. Nos. 448/02 & 634/00. Permission granted for the retention and completion of variations to permitted plans for the construction of a mixed use residential/retail development (Ref. Nos. 448/02 & 634/00) that comprise: South East Elevation (facing the Radisson SAS Hotel): 1. Creation of glazed entrance porch to main office stair core No. 3. 2. Substitution of external cladding on the second and third floor facades to Alucobond metal wall cladding. 3. Beige nap plaster on ground and first floor facade changed to beige polished store. 4. Glazed profile modified and cladding on vertical stair and lift core changed from glass block to Alucobond. 5. Addition of open louvers above vehicular ramp access. 6. Creation of glazed porch to entrance to apartment Nos. 11-21. 7. Installation of revolving door to stair core No. 3 and main office entrance. 8. Installation of Brise Soleil. South West Elevation (onto Fairgreen Road): 1. Substitution of Alucobond Metal wall Cladding on Staircore adjacent proposed future Web-Works development. 2. Installation of Brise Soleil. North West Elevation (facing the Elms): 1. Amendment of glazing pattern to second and third floor offices. 2. Revised boundary treatment. South East Elevation of Apartments adjacent future Web-Works development. 1. Addition of lightweight glass canopies over entrance doors. 2. Substitution of rendered blockwork to the third floor external apartment walkway with glass balustrade. General: 1. Increase in overall office height of building to accommodate increase depth of interna transverse concrete beams. 2. Minor height adjustments to lift & stair cores on site
Development Address: Forster Street/Lough Atalia Link Road, Galway
Architect Name: OKM Architects Location Key: FORSTER STREET/LOUGH ATALIA
Electoral Division: Planner: Liam Blake
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 05/04/2006 Manager Order: 48722
Decision Type: Conditional Number of Conditions: 6
Grant Date: 15/05/2006 Grant Managers Order #: 48995
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 14/05/2011
Decision Description: Permission and retention for development on site for minor adjustments to the approved feature roof mast on the South East Elevation (facing the Raddisson SAS Hotel); omission of part ground floor area and glazing set back on curved southern corner to provide covered entry to the retail; and provision of additional doors at ground floor to retail level approved under Ref. Nos. 448/02 & 634/00. Permission is sought for the retention and completion of variations to permitted plans for the construction of a mixed use residential/retail development (Ref. Nos. 448/02 & 634/00) that comprise: South East Elevation (facing the Radisson SAS Hotel): 1. Creation of glazed entrance porch to main office stair core No. 3. 2. Substitution of external cladding on the second and third floor facades to Alucobond metal wall cladding. 3. Beige nap plaster on ground and first floor facade changed to beige polished store. 4. Glazed profile modified and cladding on vertical stair and lift core changed from glass block to Alucobond. 5. Addition of open louvers above vehicular ramp access. 6. Creation of glazed porch to entrance to apartment Nos. 11-21. 7. Installation of revolving door to stair core No. 3 and main office entrance. 8. Installation of Brise Soleil. South West Elevation (onto Fairgreen Road): 1. Substitution of Alucobond Metal wall Cladding on Staircore adjacent proposed future Web-Works development. 2. Installation of Brise Soleil. North West Elevation (facing the Elms): 1. Amendment of glazing pattern to second and third floor offices. 2. Revised boundary treatment. South East Elevation of Apartments adjacent future Web-Works development. 1. Addition of lightweight glass canopies over entrance doors. 2. Substitution of rendered blockwork to the third floor external apartment walkway with glass balustrade. General: 1. Increase in overall office height of building to accommodate increase depth of interna transverse concrete beams. 2. Minor height adjustments to lift & stair cores on site

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: