Permission for development consisting of: (1) The erection of a classroom to the south of the Griffin building on both first and second floor level. (2) The addition of 4 No. temporary prefab classrooms to the west of the O'Reilly building and 1 No. to the north of the Griffin building and 1 No. to the east of the Griffin Building. (3) The demolition of an existing single storey structure adjacent to the O'Reilly building and the existing entrance from Palmyra Park to provide staff parking. (4) All External and Ancillary works in connection with the above development. Items 2 & 3 will be required for the duration of the construction of the new school (planning ref 06/1030). All the above works to take place within the curtilage of the Protected Structure, St. Ignatius Church, Sea Road, Galway (Ref. 9101 List of Protected Structures - Developement Plan 2005-2011) and within the Colaiste Iognaid site bounded by Sea Road and Raleigh Row. (Area 12245 sq m)
Permission for development consisting of: (1) The erection of a classroom to the south of the Griffin building on both first and second floor level. (2) The addition of 4 No. temporary prefab classrooms to the west of the O'Reilly building and 1 No. to the north of the Griffin building and 1 No. to the east of the Griffin Building. (3) The demolition of an existing single storey structure adjacent to the O'Reilly building and the existing entrance from Palmyra Park to provide staff parking. (4) All External and Ancillary works in connection with the above development. Items 2 & 3 will be required for the duration of the construction of the new school (planning ref 06/1030). All the above works to take place within the curtilage of the Protected Structure, St. Ignatius Church, Sea Road, Galway (Ref. 9101 List of Protected Structures - Developement Plan 2005-2011) and within the Colaiste Iognaid site bounded by Sea Road and Raleigh Row. (Area 12245 sq m)
Permission for development to consist of: the provision to 12 no. temporary prefab classrooms to the West of the O'Reilly Building all for a period of 24 months including all external and ancillary works within the curtilage of St. Ignatius Church which is a protected structure
Permission for development to consist of: The permission for continued usage of 12 No. temporary prefab classrooms to the west of the O'Reilly Building, all for a period of 36 months, including all external and ancillary works within the curtilage of St. Ignatius Church (protected structure)
Permission to replace the existing rainwater goods on the church which is a protected structure, with new moulded aluminium rainwater goods, and any necessary associated works and minor alterations to drainage
No Environment Impact Assesments Associated with this Application