CONSTRUCT A WINDFARM CONSISTING OF 5 NO. WIND TURBINES WITH HUB HEIGHTS OF NOT MORE THAN 85M AND AN OVERALL BLADE TIP HEIGHT OF NOT MORE THAN 120.5M, WITH ACCESS ROADS, ELECTRICAL SUB STATION AND ANCILLARY WORKS
CONSTRUCT A WINDFARM CONSISTING OF 5 NO. WIND TURBINES WITH HUB HEIGHTS OF NOT MORE THAN 85M AND AN OVERALL BLADE TIP HEIGHT OF NOT MORE THAN 120,5M WITH ACCESS ROADS, ELECTRICAL SUB-STATION, AND ANCILLARY WORKS, THE PERMISSION IS BEING SOUGHT FOR A 10 YEAR PERIOD, PREVIOUS PERMISSION FOR A WIND FARM CONSISTING OF 5 NO. TURBINES ON THIS SITE WAS GRANTED TO MAGSON HOLDINGS LTD ON 08.01.04, PLANNING REF. 03/1902, A SEPERATE APPLICATION HAS BEEN MADE FOR A FURTHER 4 NO. TURBINES ON ADJOINING LANDS, AN EIS HAS BEEN SUBMITTED
CONSTRUCT A WINDFARM CONSISTING OF 5 NO. WIND TURBINES WITH HUB HEIGHTS OF NOT MORE THAN 85M AND AN OVERALL BLADE TIP HEIGHT OF NOT MORE THAN 120.5M, WITH ACCESS ROADS, ELECTRICAL SUB STATION, AND ANCILLARY WORKS. THE PERMISSION IS BEING SOUGHT FOR A 10 YEAR PERIOD. PREVIOUS PERMISSION FOR A WIND FARM CONSISTING OF 5 NO. TURBINES ON THIS SITE WAS GRANTED TO MAGSON HOLDINGS LTD ON 8/1/'04, PLANNING REF. NO. 03/1902 (RECENT INVALIDATED APPLICATION NOS. 08/1374, 08/1676). A SEPARATE APPLICATION HAS BEEN MADE FOR A FURTHER 4 NO. TURBINES ON ADJOINING LANDS. AN EIS HAS BEEN SUBMITTED
INCREASE THE HEIGHTS OF 5 NO. WIND TUBINES (INCREASE THE HEIGHT FROM THAT PREVIOUSLY GRANTED PERMISSION BY KERRY COUNTY COUNCIL IN PLANNING REG. NO. 08/2030. ALL OTHER DETAILS AND LAYOUT REMAIN AS PER PLANNING REG NO. 08/2030)
No Environment Impact Assesments Associated with this Application