CONSTRUCT A 8,460 SQ M STARTER EXTENSION AND ASSOCIATED REVISIONS TO THE SURFACE WATER DRAINAGE NETWORK TO THE EAST OF THE EXISTING RUNWAY (RUNWAY 08/26) AND THE MODIFICATION OF THE POSITION OF THE EXISTING FIVE CROSSBAR PRECISION APPROACH LIGHTING SYSTEM, LOCATED TO THE EAST OF THE EXISTING RUNWAY (RUNWAY 08/26), BY A DISTANCE OF 90 METRES TO THE EAST
DEMOLISH EXISTING BUILDING (576 SQ.M. GROSS FLOOR AREA) LOCATED TO THE EAST OF EXISTING AIRPORT TERMINAL BUILDING AND ACCOMMODATING THE FIRE STATION, SUBSTATION AND FUEL VEHICLES AND TO CONSTRUCT 2 NO. NEW BUILDINGS WITH AN OVERALL TOTAL GROSS FLOOR AREA OF 579.20 SQ.M. TO ACCOMMODATE THESE USES, ONE BUILDING OF 448 SQ.M. GROSS FLOOR AREA WITH A MAXIMUM HEIGHT OF 8 METRES WILL ACCOMMODATE THE FIRE STATION (368 SQ.M.) AND SUBSTATION (80SQ.M.) AND WILL BE LOCATED TO THE WEST OF EXISTING AIRPORT TERMINAL BUILDING. A SECOND BUILDING OF 131.20SQ.M. GROSS FLOOR AREA AND A MAXIMUM HEIGHT OF 4.2 METRES WILL ACCOMMODATE THE FUEL VEHICLES AND WILL BE LOCATED TO THE EAST OF THE AIRPORT TERMINAL BUILDING AND TO THE NORTH-EAST OF THE EXISTING CAR PARK TO THE EAST OF THE AIRPORT. THE PROPOSED DEVELOPMENT INCLUDES ALL SITE DEVELOPMENT WORKS
RETAIN 3 NO. TEMPORARY PORTACABINS WITHIN THE EXISTING AIRPORT COMPLEX TO FACILITATE A WAITING AREA FOR PASSENGERS AND OFFICE SPACE FOR ADMINISTRATION AND OPERATION PURPOSES. THE PERMISSION SOUGHT IS FOR A PERIOD OF SEVEN YEARS.
CONSTRUCT A NEW STEEL FRAMED AIRCRAFT HANGER WITH PRIVATE ARRIVALS/DEPARTURES PICK UP AREA WITHIN THE AIRPORT LANDS AT KERRY AIRPORT, CO KERRY. THE HANGER BUILDING INCLUDES FOR AN INTERNAL AIRCRAFT STANDING AREA, AN ARRIVALS/DEPARTUES PICK UP AREA SERVED BY A COVERED VEHICLE ENTRANCE, A RECEPTION AND WAITING AREA, WITH SECURITY CECK ZONE AND ALSO TO INCORPORATE ANCILLARY SPACES INCLUDING ACCESS LOBBIES AND SANITARY AREAS. SITE WORKS PROPOSED INCLUDE CAR PARKING, HARDSTANDS, ACCESS ROADS, LANDSCAPING AND ALL ANCILLARY SITE DEVELO0PMENTS
No Environment Impact Assesments Associated with this Application