Planning Application: 181290 (Kerry County Council )
File Number:
181290
Application Type:
PERMISSION
Planning Status:
INCOMPLETED APPLICATION
Received Date:
21/12/2018
Decision Due Date:
Validated Date:
Invalidated Date:
01/02/2019
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Decision Date:
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
02/02/2019
Applicant Details
Applicant name:
GLENCLOOSAGH ENERGY LIMITED
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
CONSTRUCT UP TO 4 NO. ROTATING STABILISERS, 5 NO. BATTERY STORAGE CONTAINERS, 1 NO. CONTROL ROOM, 2 TRANSFORMERS AND ANCILLARY EQUIPMENT WITHIN A SITE AREA OF APPROXIMATELY 1.46 HECTARES.THE PERMISSION RELATES TO ALTERATIONS TO THE PERMITTED AND UNDER CONSTRUCTION KILPADDOGUE PEAKING PLANT PERMITTED BY KERRY COUNTY COUNCIL PURSUANT TO REF 13/138 AS EXTENDED BY REF 13/9138. THE ROTATING STABILISERS WILL BE SUPPORTED BY 10 NO. ELECTRICAL EQUIPMENT ROOMS WHICH WILL CONTAIN ANCILLARY POWER SUPPLY PRODUCTS INCLUDING A STATIC FREQUENCY CONVERTER (SFC), MV SWITCHGEAR, EXCITERS AND LV DISTRIBUTION AND STEP-UP/DOWN TRANSFORMERS. A HEATING VENTILATION AND AIR CONDITIONING SYSTEM (HVAC)WILL BE ATTACHED TO EACH ROTATING STABILISER. 4 NO. AUXILLARY TRANSFORMERS ARE ALSO PROPOSED. THE BATTERY CONTAINERS WILL HOUSE INDIVIDUAL BATTERY COMPONENT SWITH 2 NO. FITTED EXTERNAL HVAC SYSTEM FOR EACH. 13 NO. INVERTER STATIONS AND 14 AUXILLARY TRANSFORMERS ARE PROPOSED FOR THE BATTERY CONTAINERS . THE ENTIRE SITE WILL CONSIST OF VARIOUS UNDERGROUND CABLES AND DUCTS, BOUNDARY SECURING FENCE,COMPOUND LIGHTING AND PALISADE GATES AND FENCING , NEW INTERNAL ACCESS TRACK, SECURITY LIGHTING, CCTV, HARDSTANDING AREAS AND ALL NECESSARY FOUNDATION WORKS. PERMISSION IS ALSO SOUGHT FOR 2 ELECTRICAL TRANSFORMERS ( UP TO 220KV), ASSOCIATED HV EQUIPMENT AND UNDERGROUND ELECTRICAL GRID CONNECTION CABLING AND DUCTING CONNECTING THE DEVELOPMENT TO THE NATIONAL GRID AT THE ADJACENT ESB SUBSTATION . PLANNING PERMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS. A NATURA IMPACT STATEMENT (NIS)ACCOMPANIES THIS APPLICATION.
CONSTRUCT AN ELECTRICITY PEAKER POWER GENERATING PLANT, CONSISTING OF (1) FIFTY TWO (52) DIESEL RECIPROCATING ENGINES IN ACOUSTIC CONSTAINERS, EACH WITH AN EXTERNAL 6 M3 DIESEL FUEL SUPPLY TANK.(2) TWENTY SIX (26) EMISSION STACKS TO A MAXIMUM HEIGHT OF 15M3. CONSTRUCTION.(3) CONSTRUCTION OF AN ACCESS ROAD 210M LONG AND 20M WIDTH CONNECTED TO THE L1010 TO EIRGRID SUBSTATION ROAD. (4) CONSTRUCTION OF APPROXIMATELY 60M OF 110 KV UNDERGROUND TRANSMISSION LINE. (5)CONSTRUCTION OF AN ELECTRICAL COMPOUND OF 4141 M2 FLOOR AREA CONTAINING A MAXIMUM OF TWO (2) 110KV SUBSTATIONS, MAXIMUM OF FOUR (4NO) SWITCHGEAR AND ASSOCIATED LOAD BANKS AND AUXILLARY/CONTROLS. (6) CONSTRUCTION OF A MAXIMUM OF FOUR (4) CARBON STEEL DIESEL STORAGE TANKS OF 11.8 M DIAMETER BY 6.1M HEIGHT WITH HOLDING CAPACITY OF 625M2 EACH WITH ASSOCIATED BUNDING AND ADJACENT FILLING APRON.(7) CONSTRUCTION OF A 20 M3 FIREWATER TANK. (8) CONSTRUCTION OF A CONTROL BUILDING OF 51.25M2 FLOOR AREA AND 4.0M HIGH WITH ASSOCIATED WASTE WATER HOLDING TANK. (9)SITE FENCING AND ASSOCIATED ANCILLARY SERVICES.AN ENVIRONMENTAL IMPACT STATEMENT AND NATURA IMPACT STATEMENT ACCOMPANIES THIS APPLICATION. THIS APPLICATION ALSO RELATES TO DEVELOPMENT WHICH COMPRISES OR IS FORTHE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION CONTROL LICENCE.
CONSTRUCT AN ELECTRICITY PEAKER POWER GENERATING PLANT, CONSISTING OF (1) FIFTY TWO (52) DIESEL RECIPROCATING ENGINES IN ACOUSTIC CONTAINERS, EACH WITH AN EXTERNAL 6 M3 DIESEL FUEL SUPPLY TANK. (2) TWENTY SIX (26) EMISSION STACKS TO A MAXIMUM HEIGHT OF 15M (3) CONSTRUCTION OF AN ACCESS ROAD 210M LONG AND 20M WIDTH CONNECTED TO THE L1010 TO EIRGRID SUBSTATION ROAD. (4) CONSTRUCTION OF APPROXIMATELY 60M OF 110 KV UNDERGROUND TRANSMISSION LINE. (5)CONSTRUCTION OF AN ELECTRICAL COMPOUND OF 4141 M2 FLOOR AREA CONTAINING A MAXIMUM OF TWO (2) 110KV SUBSTATIONS, MAXIMUM OF FOUR (4NO) SWITCHGEAR AND ASSOCIATED LOAD BANKS AND AUXILLARY/CONTROLS. (6) CONSTRUCTION OF A MAXIMUM OF FOUR (4) CARBON STEEL DIESEL STORAGE TANKS OF 11.8 M DIAMETER BY 6.1M HEIGHT WITH HOLDING CAPACITY OF 625M3 EACH WITH ASSOCIATED BUNDING AND ADJACENT FILLING APRON.(7) CONSTRUCTION OF A 20 M3 FIREWATER TANK. (8) CONSTRUCTION OF A CONTROL BUILDING OF 51.25M2 FLOOR AREA AND 4.0M HIGH WITH ASSOCIATED WASTE WATER HOLDING TANK. (9)SITE FENCING AND ASSORTED ANCILLARY SERVICES. AN ENVIRONMENTAL IMPACT STATEMENT AND NATURA IMPACT STATEMENT ACCOMPANIES THIS APPLICATION. THIS APPLICATION ALSO RELATES TO DEVELOPMENT WHICH COMPRISES OR IS FOR THE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION CONTROL LICENCE.
CONSTRUCT AN ELECTRICITY PEAKER POWER GENERATING PLANT, CONSISTING OF (1) FIFTY TWO (52) DIESEL RECIPROCATING ENGINES IN ACOUSTIC CONTAINERS, EACH WITH AN EXTERNAL 6 M3 DIESEL FUEL SUPPLY TANK. (2) TWENTY SIX (26) EMISSION STACKS TO A MAXIMUM HEIGHT OF 15M (3) CONSTRUCTION OF AN ACCESS ROAD 210M LONG AND 20M WIDTH CONNECTED TO THE L1010 TO EIRGRID SUBSTATION ROAD. (4) CONSTRUCTION OF APPROXIMATELY 60M OF 110 KV UNDERGROUND TRANSMISSION LINE. (5)CONSTRUCTION OF AN ELECTRICAL COMPOUND OF 4141 M2 FLOOR AREA CONTAINING A MAXIMUM OF TWO (2) 110KV SUBSTATIONS, MAXIMUM OF FOUR (4NO) SWITCHGEAR AND ASSOCIATED LOAD BANKS AND AUXILLARY/CONTROLS. (6) CONSTRUCTION OF A MAXIMUM OF FOUR (4) CARBON STEEL DIESEL STORAGE TANKS OF 11.8 M DIAMETER BY 6.1M HEIGHT WITH HOLDING CAPACITY OF 625M3 EACH WITH ASSOCIATED BUNDING AND ADJACENT FILLING APRON.(7) CONSTRUCTION OF A 20 M3 FIREWATER TANK. (8) CONSTRUCTION OF A CONTROL BUILDING OF 51.25M2 FLOOR AREA AND 4.0M HIGH WITH ASSOCIATED WASTE WATER HOLDING TANK. (9)SITE FENCING AND ASSORTED ANCILLARY SERVICES. AN ENVIRONMENTAL IMPACT STATEMENT AND NATURA IMPACT STATEMENT ACCOMPANIES THIS APPLICATION. THIS APPLICATION ALSO RELATES TO DEVELOPMENT WHICH COMPRISES OR IS FOR THE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION CONTROL LICENCE.