File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
002577 |
APPLICATION FINALISED |
PERMISSION |
C |
08/08/2000 Tuesday |
THE GOVERNERS OF THE BANK OF IRELAND |
KERRY AIRPORT FARRANFORE
|
INSTALL AN AUTOMATIC TELLER MACHINE WITH CANOPY AND SIGNAGE |
02305 |
APPLICATION FINALISED |
PERMISSION |
C |
14/02/2002 Thursday |
KERRY AIRPORT PLC. |
KERRY AIRPORT FARRANFORE/GEARHA FARRANFORE |
TO ALTER AND EXTEND BAGGAGE HANDLING AREA |
033162 |
APPLICATION FINALISED |
PERMISSION |
C |
28/10/2003 Tuesday |
KERRY AIRPORT PLC |
GEARHA/GORTSHANAVOGH FARRANFORE CO. KERRY |
CONSTRUCT A CAR VALETING UNIT AND EXTERNAL WASH BAY, INCLUDING ANCILLARY SITE WORKS AND ADDITIONAL CAR PARKING AREA |
041206 |
APPLICATION FINALISED |
OUTLINE PERMISSION |
R |
25/03/2004 Thursday |
JOHN R ROCHE |
FIERIES CASTLEISLAND |
ERECT TWO NO. DWELLING HOUSES INCLUDING ASSOCIATED PROPRIETARY EFFLUENT TREATMENT PLANTS |
051936 |
APPLICATION FINALISED |
PERMISSION |
C |
09/06/2005 Thursday |
KERRY AIRPORT PLC. |
KERRY AIRPORT GEARHA FARRANFORE |
PROVIDE BUS PARKING FACILITY, BUS SHELTER, TAXI RANK, ADDITIONAL CAR PARKING AND ALL ASSOCIATED SITE WORKS |
091365 |
APPLICATION FINALISED |
PERMISSION |
C |
03/11/2009 Tuesday |
KERRY AIRPORT PLC |
GEARHA FARRANFORE CO KERRY |
CONSTRUCT A 8,460 SQ M STARTER EXTENSION AND ASSOCIATED REVISIONS TO THE SURFACE WATER DRAINAGE NETWORK TO THE EAST OF THE EXISTING RUNWAY (RUNWAY 08/26) AND THE MODIFICATION OF THE POSITION OF THE EXISTING FIVE CROSSBAR PRECISION APPROACH LIGHTING SYSTEM, LOCATED TO THE EAST OF THE EXISTING RUNWAY (RUNWAY 08/26), BY A DISTANCE OF 90 METRES TO THE EAST |
10936 |
APPLICATION FINALISED |
PERMISSION |
C |
13/09/2010 Monday |
KERRY AIRPORT PLC |
KERRY AIRPORT GEARHA FARRANFORE |
DEMOLISH EXISTING BUILDING (576 SQ.M. GROSS FLOOR AREA) LOCATED TO THE EAST OF EXISTING AIRPORT TERMINAL BUILDING AND ACCOMMODATING THE FIRE STATION, SUBSTATION AND FUEL VEHICLES AND TO CONSTRUCT 2 NO. NEW BUILDINGS WITH AN OVERALL TOTAL GROSS FLOOR AREA OF 579.20 SQ.M. TO ACCOMMODATE THESE USES, ONE BUILDING OF 448 SQ.M. GROSS FLOOR AREA WITH A MAXIMUM HEIGHT OF 8 METRES WILL ACCOMMODATE THE FIRE STATION (368 SQ.M.) AND SUBSTATION (80SQ.M.) AND WILL BE LOCATED TO THE WEST OF EXISTING AIRPORT TERMINAL BUILDING. A SECOND BUILDING OF 131.20SQ.M. GROSS FLOOR AREA AND A MAXIMUM HEIGHT OF 4.2 METRES WILL ACCOMMODATE THE FUEL VEHICLES AND WILL BE LOCATED TO THE EAST OF THE AIRPORT TERMINAL BUILDING AND TO THE NORTH-EAST OF THE EXISTING CAR PARK TO THE EAST OF THE AIRPORT. THE PROPOSED DEVELOPMENT INCLUDES ALL SITE DEVELOPMENT WORKS |
19335 |
APPLICATION FINALISED |
RETENTION PERMISSION |
C |
02/04/2019 Tuesday |
KERRY AIRPORT |
KERRY AIRPORT FARRANFORE CO KERRY |
RETAIN 3 NO. TEMPORARY PORTACABINS WITHIN THE EXISTING AIRPORT COMPLEX TO FACILITATE A WAITING AREA FOR PASSENGERS AND OFFICE SPACE FOR ADMINISTRATION AND OPERATION PURPOSES. THE PERMISSION SOUGHT IS FOR A PERIOD OF SEVEN YEARS. |
19817 |
APPLICATION FINALISED |
PERMISSION |
C |
31/07/2019 Wednesday |
KERRY AIRPORT |
GORTSHANAVOGH FARRANFORE CO.KERRY |
CONSTRUCT A VEHICLE AND MACHINERY PARKING SHED WITH ALL ASSOCIATED ANCILLARY SITE WORKS WITHIN THE KERRY AIRPORT SITE |
2036 |
APPLICATION FINALISED |
PERMISSION |
R |
22/01/2020 Wednesday |
KERRY AIRPORT |
GEARHA FARRANFORE CO KERRY |
CONSTRUCT A ROADSIDE SIGN WITH SIGN LIGHTING AND ALL ASSOCIATED ANCILLARY SITE WORKS |
931351 |
APPLICATION FINALISED |
PERMISSION |
C |
30/09/1993 Thursday |
KERRY CO AIRPORT |
FARRANFORE
|
HANGER, OFFICES & SITE WORKS |
941223 |
APPLICATION FINALISED |
PERMISSION |
C |
30/08/1994 Tuesday |
KERRY AIRPORT PLC. |
KERRY AIRPORT GEARHA FARRANFORE |
EXTEND EXISTING TERMINAL BUILDING IN ORDER TO PROVIDE ADDITIONAL OFFICE ACCOMODATION |
941225 |
APPLICATION FINALISED |
PERMISSION |
C |
30/08/1994 Tuesday |
KERRY AIRPORT PLC |
KERRY AIRPORT GEARHA FARRANFORE |
TO EXTEND EXISTING CAR PARK AND PROVIDE NEW BUS LET DOWN AREA |