Planning Application: 2560741 (Kerry County Council )
File Number:
2560741
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
26/08/2025
Decision Due Date:
20/10/2025
Validated Date:
26/08/2025
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
20/10/2025
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Kerry Mechanical Engineering Ltd
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
(A) Decommission existing septic tank and; percolation system, (B) Install New mechanical aeration unit and polishing filter system to new location on site, (C) Construct a concrete yard to area of decommissioned septic tank and percolation system, (D) Construct a new concrete storage yard to serve
existing premises with all associated site works.
Development Address:
Kilmeaney, Listowel, Co. Kerry, V31 FF88
Architect Name:
Location Key:
KILMEANEY
Electoral Division:
Kilmeany (Part Of)
Planner:
Michael Mills
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
20/10/2025
Manager Order:
Decision Type:
Conditional
Number of Conditions:
5
Grant Date:
21/11/2025
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
20/11/2030
Decision Description:
(A) Decommission existing septic tank and; percolation system, (B) Install New mechanical aeration unit and polishing filter system to new location on site, (C) Construct a concrete yard to area of decommissioned septic tank and percolation system, (D) Construct a new concrete storage yard to serve
existing premises with all associated site works.
(A) RETAIN EXTENSION TO MAIN FABRICATION BUILDING, MAINTENANCE BUILDING AND LOCKER ROOM AS CONSTRUCTED, (B) RETAIN DRILL LINE BUILDING AS CONSTRUCTED, (C) RETAIN NEW CONCRETE YARD, GRAVEL HARDSTAND AND OVER GROUND RAINWATER STORAGE TANK AND (D) CONSTRUCT NEW OFFICES, STORES AND MEASURE ROOMS, ALL ABOVE WITHIN THE SITE BOUNDARIES AS DETAILED ON THE SITE LOCATION AND SITE LAYOUT PLANS
CONSTRUCT OFFICES, STORE AND MEASURE ROOM, GRANTED PLANNING PERMISSION PREVIOUSLY UNDER PLANNING REF. NO. 16/738, ALL ABOVE WITHIN THE SITE BOUNDARIES AS DETAILED ON THE SITE LOCATION AND SITE LAYOUT PLANS
CONSTRUCT AN EXTENSION TO THE EXISTING ASSEMBLY BUILDING AT THE EXISTING FACILITY, IN WHICH THE EXTENSION IS LOCATED TO THE REAR OF THE EXISTING ASSEMBLY BUILDING
CONSTRUCTION OF ONE STOREY, MATERIAL STORAGE SHED INCLUSIVE OF ALL INFRASTRUCTURAL WORKS INCLUDING SURFACE WATER DRAINAGE AND CONNECTION TO EXISTING SERVICES ON SITE, ALL LIGHTING AND ASSOCIATED WORKS