DEMOLISH EXISTING BUILDING (576 SQ.M. GROSS FLOOR AREA) LOCATED TO THE EAST OF EXISTING AIRPORT TERMINAL BUILDING AND ACCOMMODATING THE FIRE STATION, SUBSTATION AND FUEL VEHICLES AND TO CONSTRUCT 2 NO. NEW BUILDINGS WITH AN OVERALL TOTAL GROSS FLOOR AREA OF 579.20 SQ.M. TO ACCOMMODATE THESE USES, ONE BUILDING OF 448 SQ.M. GROSS FLOOR AREA WITH A MAXIMUM HEIGHT OF 8 METRES WILL ACCOMMODATE THE FIRE STATION (368 SQ.M.) AND SUBSTATION (80SQ.M.) AND WILL BE LOCATED TO THE WEST OF EXISTING AIRPORT TERMINAL BUILDING. A SECOND BUILDING OF 131.20SQ.M. GROSS FLOOR AREA AND A MAXIMUM HEIGHT OF 4.2 METRES WILL ACCOMMODATE THE FUEL VEHICLES AND WILL BE LOCATED TO THE EAST OF THE AIRPORT TERMINAL BUILDING AND TO THE NORTH-EAST OF THE EXISTING CAR PARK TO THE EAST OF THE AIRPORT. THE PROPOSED DEVELOPMENT INCLUDES ALL SITE DEVELOPMENT WORKS
No Environment Impact Assesments Associated with this Application