(A) CHANGE OF USE OF THE EXISTING STORAGE BUILDING TO A WASTE STORAGE BUILDING AND INCREASE THE ROOF HEIGHT OF THIS BUILDING INCLUDING NECESSARY ALTERATIONS, (B) PROVIDE AN EMPTY SKIP STORAGE AREA WITHIN THE EXISTING YARD, (C) PROVIDE A LOADING AREA WITHIN THE EXISTING YARD, (D) ALTER AND EXTEND THE EXISTING ACCESS ROAD, (E) DEMOLISH AN EXISTING STORAGE SHED TO ALLOW FOR ALTERATIONS TO THE ACCESS ROAD, (F) CARRY OUT ALL NECESSARY ESSARY SITE WORKS
(A) CONSTRUCT A WASTE STORAGE BUILDING WITH THE BOUNDARIES OF THEIR EXISTING YARD. (THIS BUILDING IS TO BE USED IN PLACE OF THE PREVIOUSLY GRANTED WASTE STOREY BUILDING ON THE SITE, WHICH WILL NOT BE CONSTRUCTED OR USED IF THIS APPLICATION IS SUCCESSFUL), (B) CARRY OUT ALL NECESSARY SITE WORKS
(A) ALTER THE SITE BOUNDARIES, (B) RETAIN ALTERATIONS TO THE SITE ACCESS LAYOUT, (C) EXTEND ONE OF THE EXISTING STRUCTURES ON SITE TO FACILITATE THE RECEIVING, SORTING AND BAILING OF PLASTICS WITHIN THE STRUCTURE INCLUDING ALL NECESSARY SITE WOKS
SEIRBHIS SCIB TEORANTA TRADING AS WEST KERRY WASTE
BALLYHAEBOUGHT DINGLE CO KERRY
CHANGE CONDITION 7 OF AN BORD PLEANALA'S GRANT OF PLANNING PERMISSION (PL08.233738) ONLY CLEAN DRY PLASTIC WASTE IS PERMITTED TO BE STORED, SORTED AND BALED ON SITE. ALL WASTE SHALL BE STORED, SORTED AND BALED INDOORS ONLY TO DELETE THE WORD PLASTIC TO ALLOW THE APPLICANT TO STORE, SORT AND BALE A VARIETY OF DRY, NON HAZARDOUS WASTES ON SITE