File Number: | 12435 | ||
Application Type: | PERMISSION | Planning Status: | APPLICATION FINALISED |
Received Date: | 25/05/2012 | Decision Due Date: | 19/09/2012 |
Validated Date: | 25/05/2012 | Invalidated Date: | |
Further Info Requested: | 19/07/2012 | Further Info Received: | 26/07/2012 |
Withdrawn Date: | Extend Date: | ||
Decision Type: | Conditional | Decision Date: | 15/08/2012 |
Leave to Appeal: | Appeal Date: | 10/09/2012 | |
Commenced Date: | Submissions By: |
Applicant Details |
|||
---|---|---|---|
Applicant name: | Intel Ireland Limited | ||
Applicant Address: | |||
Phone Number: | Fax Number: | ||
Corresp. Address: |
Proposed Development |
|||
---|---|---|---|
Development Description: | Buildings and ancillary works, alongside existing site infrastructure and buildings, all operating as an integrated campus, for the manufacture of integrated circuits. A 10 year planning permission is requested. The proposed development comprises:- (a) Manufacturing buildings consisting of a fabrication facility (Fab) [parapet height of 36m], including administration and storage with total gross floor area of 162,536 sq.m, including roof mounted stacks, ranging in height form 4.5m to 15m above parapet and a 2 storey above ground link to the IR5 building. (b) Utility support buildings consisting of (i) boiler and chiller building and associated cooling towers, 10,359 sq.m and 17m high, (ii) water treatment building, 14,192sq.m and 22m high, (iii) emergency and electrical support buildings (the first building is sized 1334 sq.m and 11m high with associated stacks 7m above parapet level; the second building is 421 sq.m and 8m high and the third is 254sq.m and 8m high) (c) A multi storey car park accommodating 2,200 cars, 63,047 sq.m and 15m high. (d) A chemical store, 1244 sq.m and 10m high, and 5 number tanks 32m in diameter and 7m high and a pumphouse 143 sq.m and 4.8m high. (e) Other ancillary works include new underground utilities, landscaping, new fencing and screening berms, yard structures for all buildings, bulk storage for gases and liquids (roofed compounds 2,278 sq.m, 5.5m high), 2 no. sprinkler tanks and associated pumps, pipebridge structures, stacks and roof mounted equipment to all buildings and a new retention pond. The works also include new internal road layouts throughout and modifications to the west side main vehicular entrance together with modifications to the R148 road. This application consists of a variation to a previously permitted development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act 2003) is required and full details of the proposed development and its anticipated environmental impacts will be notified to the Environmental Protection Agency. An Environmental Impact Statement and a Natura Impact Statement accompany this application, and they will be available for inspection or purchase at the office of the Planning Authority etc.... | ||
Development Address: | Collinstown, Leixlip, Blakestown, Kellystown, Collinstown Industrial Park,, Leixlip, Co. Kildare | ||
Architect Name: | Location Key: | COLLINSTOWN LEIXLIP | |
Electoral Division: | Planner: | Elaine Donohoe | |
Social Housing Exempt: | Plan Enforcement #: | ||
IPC Licence Required: | Yes | Waste Licence Required: | No |
Protected Structure: | No | Protected Structure #: | |
Development Name: |
Comments |
|||
---|---|---|---|
Significant Case Flag: | Comments: |
Decision |
|||
---|---|---|---|
Decision Date: | 15/08/2012 | Manager Order: | 36876 |
Decision Type: | Conditional | Number of Conditions: | 45 |
Grant Date: | 17/01/2013 | Grant Managers Order #: | |
Section 47 Apply?: | Part 5 Apply?: | ||
Expiry Date: | 16/01/2018 | ||
Decision Description: | Buildings and ancillary works, alongside existing site infrastructure and buildings, all operating as an integrated campus, for the manufacture of integrated circuits. A 10 year planning permission is requested. The proposed development comprises:- (a) Manufacturing buildings consisting of a fabrication facility (Fab) [parapet height of 36m], including administration and storage with total gross floor area of 162,536 sq.m, including roof mounted stacks, ranging in height form 4.5m to 15m above parapet and a 2 storey above ground link to the IR5 building. (b) Utility support buildings consisting of (i) boiler and chiller building and associated cooling towers, 10,359 sq.m and 17m high, (ii) water treatment building, 14,192sq.m and 22m high, (iii) emergency and electrical support buildings (the first building is sized 1334 sq.m and 11m high with associated stacks 7m above parapet level; the second building is 421 sq.m and 8m high and the third is 254sq.m and 8m high) (c) A multi storey car park accommodating 2,200 cars, 63,047 sq.m and 15m high. (d) A chemical store, 1244 sq.m and 10m high, and 5 number tanks 32m in diameter and 7m high and a pumphouse 143 sq.m and 4.8m high. (e) Other ancillary works include new underground utilities, landscaping, new fencing and screening berms, yard structures for all buildings, bulk storage for gases and liquids (roofed compounds 2,278 sq.m, 5.5m high), 2 no. sprinkler tanks and associated pumps, pipebridge structures, stacks and roof mounted equipment to all buildings and a new retention pond. The works also include new internal road layouts throughout and modifications to the west side main vehicular entrance together with modifications to the R148 road. This application consists of a variation to a previously permitted development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act 2003) is required and full details of the proposed development and its anticipated environmental impacts will be notified to the Environmental Protection Agency. An Environmental Impact Statement and a Natura Impact Statement accompany this application, and they will be available for inspection or purchase at the office of the Planning Authority etc.... |
Appeal Details | |||
---|---|---|---|
Notification Date: | 11/09/2012 | BP Reference #: | Pl 09.241071 |
Appeal Type: | THIRD PARTY | File Forward Date: | 25/09/2012 |
Submission Due Date: | 08/10/2012 | Submission Sent Date: | |
Appeal Decision: | CONDITIONAL | Decision Date: | 17/01/2013 |
Withdrawn Date: | Dismissed Date: | ||
Reason: |