Planning Application: 12993 (Kildare County Council )
File Number:
12993
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
21/12/2012
Decision Due Date:
23/02/2013
Validated Date:
21/12/2012
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
19/02/2013
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
02/02/2013
Applicant Details
Applicant name:
Intel Ireland Ltd.
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
Modifications and alterations to the previously permitted Ryebrook extension (Intel dedicated) high tension substation compound (Kildare County Council Planning Ref. Ref: 11/1207), including: (1) The relocation and redesign of the permitted electrical building. The building will now be 275 square metres and 6 metres high; (2) The relocation and vertical extension of both existing low level end mast pylons by 4.5 metres giving a total height of 20.75 metres from their current location south-west of the permitted compound to directly adjacent and north-east of the permitted compound area; (3) Modifications to the fencing and underground services; and (4) Associated site development works. This application consists of a variation to a previously permitted development on an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003) is required and full details of the proposed development and its anticipated environmental impacts will be notified to the Environmental Protection Agency. The development consists of modifications to an establishment within the meaning of the European Communities (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2006,
Development Address:
Collinstown Industrial Park, Leixlip, Co. Kildare
Architect Name:
Gerry Loughrey
Location Key:
COLLINSTOWN LEIXLIP
Electoral Division:
Planner:
Elaine Donohoe
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
Yes
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
19/02/2013
Manager Order:
37261
Decision Type:
Conditional
Number of Conditions:
15
Grant Date:
22/03/2013
Grant Managers Order #:
37261
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
21/03/2018
Decision Description:
Modifications and alterations to the previously permitted Ryebrook extension (Intel dedicated) high tension substation compound (Kildare County Council Planning Ref. Ref: 11/1207), including: (1) The relocation and redesign of the permitted electrical building. The building will now be 275 square metres and 6 metres high; (2) The relocation and vertical extension of both existing low level end mast pylons by 4.5 metres giving a total height of 20.75 metres from their current location south-west of the permitted compound to directly adjacent and north-east of the permitted compound area; (3) Modifications to the fencing and underground services; and (4) Associated site development works. This application consists of a variation to a previously permitted development on an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003) is required and full details of the proposed development and its anticipated environmental impacts will be notified to the Environmental Protection Agency. The development consists of modifications to an establishment within the meaning of the European Communities (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2006,
Collinstown, Leixlip Blakestown, Kellystown Collinstown Industrial Park
(1) Modular Storage Unit. A Single storey storage unit, sized approximately 7 metres by 12 metres and 6 metre high, located in the Utilities Yard to the north of the existing Fab10 Support Building. (2) FAB10 Waste Tanks. The installation of 3no. new bunded waste storage tanks, 2no. sized approximately 2.5 metres in diameter and 16.5 metres high, located in the Utilities Yard to north of the existing Fab10 Support Building and 1no. sized approximately 3.7metres in diameter and 15 metres high located to the north of the Fab10 Utilities Yard. (3) Process Support Building Extension. The construction of a two-storey extension to the existing Process Support Building (PSB) sized approximately 20 metres by 11 metres and 14 metres high, located to the north east of the existing Fab 24 Process Support Building. (4) FAB24 and FAB14 Waste Tanks. The installation of 3no. additional waste tanks and associated access platforms and stairways, 1no. sized approximately 9 metres by 10 metres and 7 metres high, located in the Utilities Yard to the north of the existing FAB24 Manufacturing Building and 1no. sized approximately 3 metres high located to the south of existing FAB14 Process Building and 1 no. sized approximately 4.25 metres in diameter and 16 metres high, located to the south of existing FAB14 process Building.(5) Site Works. The proposed development includes linking pipe-bridges to the Fab10 and Fab14 support buildings, site development works, site utilities, site lighting, separation walls, road alterations, landscaping and all associated site works. This application consists of a variation to a previously permitted development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required. A Natura Impact Statement ("NIS") accompanies this application for inspection or purchase at the office of the Planning Authority. This is a site to which the Chemical Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I.209 of 2015) applies
No Environment Impact Assesments Associated with this Application