Planning application details ref: 1475 Kildare County Council

100%100% Complete (warning)

Planning Application: 1475 (Kildare County Council )
File Number: 1475
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 07/02/2014 Decision Due Date: 03/04/2014
Validated Date: 07/02/2014 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 03/04/2014
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By: 13/03/2014

Applicant Details

Applicant name: Intel Ireland Limited
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: construction of a structure to provide weather protection within the previously permitted Ryebrook Extension (Intel dedicated) high tension Sub-station Compound (Kildare County Council Planning Reg. Ref. 11/1207 and 12/993), including roof, support steelwork and side cladding, 9.3 metres high over an area of 740 square metres. This application consists of a variation to a previously permitted development on an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003, now Industrial Emissions Licence) is required and full details of the proposed development and its anticipated environmental impacts will be notified to the Environmental Protection Agency. The development consists of modifications to an establishment within the meaning of the European Communities (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2006,
Development Address: Collinstown Industrial Park , (Collinstown, Leixlip, Blakestown and Kellystown Townlands), Leixlip, Co. Kildare.
Architect Name: Gerry Loughrey - Jacobs Engineering Location Key: COLLINSTOWN LEIXLIP
Electoral Division: Planner: Elaine Donohoe
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 03/04/2014 Manager Order: 38190
Decision Type: Conditional Number of Conditions: 3
Grant Date: 05/05/2014 Grant Managers Order #: 38190
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 04/05/2019
Decision Description: construction of a structure to provide weather protection within the previously permitted Ryebrook Extension (Intel dedicated) high tension Sub-station Compound (Kildare County Council Planning Reg. Ref. 11/1207 and 12/993), including roof, support steelwork and side cladding, 9.3 metres high over an area of 740 square metres. This application consists of a variation to a previously permitted development on an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003, now Industrial Emissions Licence) is required and full details of the proposed development and its anticipated environmental impacts will be notified to the Environmental Protection Agency. The development consists of modifications to an establishment within the meaning of the European Communities (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2006,

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: