Planning application details ref: 19378 Kildare County Council

100%100% Complete (warning)

Planning Application: 19378 (Kildare County Council )
File Number: 19378
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 08/04/2019 Decision Due Date: 22/07/2019
Validated Date: 08/04/2019 Invalidated Date:
Further Info Requested: 29/05/2019 Further Info Received: 25/06/2019
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 19/07/2019
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By:

Applicant Details

Applicant name: Montane Developments Irl Ltd.
Applicant Address:
Phone Number: Fax Number: 25181829
Corresp. Address:

Applicant Details


Proposed Development

Development Description: a new access road linking the Athgarvan Road to Kilbelin Abbey. The development will consist of the construction of an 8.5m wide access road consisting of 5.5m carriageway, 1.5m cycle lane, 1.5m footpath and grass verge. The development also includes construction of a 1.8m high capped and rendered boundary block wall with the installation of public lighting and surface water services and all remaining site associated works. The proposed new road replaces a temporary access used for construction vehicles accessing the site granted by An Bord Pleanala PL09.243623 (13/708)
Development Address: Walshestown, , Newbridge, , Co.Kildare
Architect Name: Location Key: NEWBRIDGE
Electoral Division: Planner: John O'Hara
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 19/07/2019 Manager Order: DO24468
Decision Type: Conditional Number of Conditions: 14
Grant Date: 27/08/2019 Grant Managers Order #: DO24468
Section 47 Apply?: No Part 5 Apply?: No
Expiry Date: 26/08/2024
Decision Description: a new access road linking the Athgarvan Road to Kilbelin Abbey. The development will consist of the construction of an 8.5m wide access road consisting of 5.5m carriageway, 1.5m cycle lane, 1.5m footpath and grass verge. The development also includes construction of a 1.8m high capped and rendered boundary block wall with the installation of public lighting and surface water services and all remaining site associated works. The proposed new road replaces a temporary access used for construction vehicles accessing the site granted by An Bord Pleanala PL09.243623 (13/708)

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: