Planning Application: 20227 (Kildare County Council )
File Number:
20227
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
06/03/2020
Decision Due Date:
30/04/2020
Validated Date:
06/03/2020
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Refused
Decision Date:
15/06/2020
Leave to Appeal:
Appeal Date:
15/07/2020
Commenced Date:
Submissions By:
09/04/2020
Applicant Details
Applicant name:
Padraic Ryan
Applicant Address:
Phone Number:
Fax Number:
23945306
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
the construction of 18no. new two storey dwellings (17no. generally to the rear & side of Glebe House & 1no. part barrell vaulted roof dwelling to the side/north east of Glebe House on the site of the existing barn being demolished adjacent to New Road) together with the demolition of a modern single storey extension to the side/south west of Glebe House, the conversion & refurbishment of Glebe House & associated extensions & outhouse (currently a two storey over basement dwelling divided into 5no. dwellings & associated accommodation), to create 4no. two-bed apartments with associated accommodation and outhouse for bin/bicycle/general storage, the conversion & refurbishment of the existing two storey detached Coach House (currently divided into 3 no. dwellings) adjacent to Glebe house (to include the demolition of the modern single storey extension to the rear of the Coach House), to create a one bed dwelling. The vehicle entrance to the site will be through the existing site entrance opposite Scoil Bhride National School on New Road. The works will also include the demolition of an existing one bed single storey detached dwelling to the rear of Glebe House and the demolition of an existing unauthorized single storey Boilerhouse built adjacent to the north western boundary of the site. The 18no. new dwellings will consist of the following: 3no. Type A, two storey detached, four bed dwellings; 1no. Type B, two storey detached, four bed dwelling, with part barrell vaulted roof, on the site of the existing haybarn being demolished; 6no. Type C, two storey and part single storey semi-detached, four bed dwellings; 2no. Type D, two storey and part single storey detached, four bed dwellings; 3no. Type E & 1no. Type E1, two storey and part single storey semi-detached, three bed dwellings; 1no. Type F, two storey and part single storey detached, five bed dwelling; 1no. Type H, two storey and part single storey detached, five bed dwelling; the provision of solar photovoltaic panels (PV) on the roofs of the new dwellings and the existing Coach House, the provision of all associated & ancillary site works, boundary treatments and landscaping works to include the reinstatement of some historical pathways to the front of Glebe House, the conversion of the existing site entrance and driveway (to the front of Glebe House & adjacent to The Beeches housing development) into a pedestrian/cycle route accessing Glebe House,
Development Address:
Glebe House,, New Road,, Straffan,, Co. Kildare.
Architect Name:
Aoife Burke
Location Key:
STRAFFAN
Electoral Division:
Planner:
Elaine Donohoe
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
Yes
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
15/06/2020
Manager Order:
DO28891
Decision Type:
Refused
Number of Conditions:
2
Grant Date:
26/01/2021
Grant Managers Order #:
ABP307534
Section 47
Apply?:
Part 5
Apply?:
Yes
Expiry Date:
25/01/2026
Decision Description:
the construction of 18no. new two storey dwellings (17no. generally to the rear & side of Glebe House & 1no. part barrell vaulted roof dwelling to the side/north east of Glebe House on the site of the existing barn being demolished adjacent to New Road) together with the demolition of a modern single storey extension to the side/south west of Glebe House, the conversion & refurbishment of Glebe House & associated extensions & outhouse (currently a two storey over basement dwelling divided into 5no. dwellings & associated accommodation), to create 4no. two-bed apartments with associated accommodation and outhouse for bin/bicycle/general storage, the conversion & refurbishment of the existing two storey detached Coach House (currently divided into 3 no. dwellings) adjacent to Glebe house (to include the demolition of the modern single storey extension to the rear of the Coach House), to create a one bed dwelling. The vehicle entrance to the site will be through the existing site entrance opposite Scoil Bhride National School on New Road. The works will also include the demolition of an existing one bed single storey detached dwelling to the rear of Glebe House and the demolition of an existing unauthorized single storey Boilerhouse built adjacent to the north western boundary of the site. The 18no. new dwellings will consist of the following: 3no. Type A, two storey detached, four bed dwellings; 1no. Type B, two storey detached, four bed dwelling, with part barrell vaulted roof, on the site of the existing haybarn being demolished; 6no. Type C, two storey and part single storey semi-detached, four bed dwellings; 2no. Type D, two storey and part single storey detached, four bed dwellings; 3no. Type E & 1no. Type E1, two storey and part single storey semi-detached, three bed dwellings; 1no. Type F, two storey and part single storey detached, five bed dwelling; 1no. Type H, two storey and part single storey detached, five bed dwelling; the provision of solar photovoltaic panels (PV) on the roofs of the new dwellings and the existing Coach House, the provision of all associated & ancillary site works, boundary treatments and landscaping works to include the reinstatement of some historical pathways to the front of Glebe House, the conversion of the existing site entrance and driveway (to the front of Glebe House & adjacent to The Beeches housing development) into a pedestrian/cycle route accessing Glebe House,
18/2storey residential units in 1 block with separate caretakers accomm. & development to include Biocycle Effluent Treatment System with associated percolation pipework, upgrading of existing on vehicular entrance from public road, etc
for residential development consisting of 18 no. two storey three bedroom terraced houses, 10 no. two bedroom apartments in two storey building including balconies and 4 no. two storey two bedroom terraced houses, etc
the demolition of the existing barn to the North of Glebe House, adjacent to New Road and the construction of 18 no. two storey houses and 2 no. two storey apartment blocks each containing 2 no. apartments with associated accommodation including bin stores, bicycle parking and new vehicular, cycle and pedestrian access. (22 no. units comprising 18no. Houses and 2no. Apartments generally to the rear and side of Glebe House and 2no. Apartments on the site of the existing barn being demolished). These 22 dwelling units are in addition to the 5 dwellings approved under Planning Reference ABP-307534-20, on this site (along with the conversion of the existing site entrance and driveway into a pedestrian route). The vehicular entrance will be through the existing site entrance opposite Scoil Bhride National School on New Road. A new drop off lay-by is provided, on New Road, adjacent to the existing site entrance and driveway. The 22 new dwellings being applied for comprise the following; 1no. Type A1 (1no. 1bed apartment & 1no. 2bed apartment in two storey block); 1no. Type A2 (2no. 2bed apartments in two storey block); 5no. Type B (two storey terraced 3bed house) & 1no. Type B1 (two storey end terraced 3bed house); 3no. Type C (two storey detached 4bed houses); 7no. Type D (4 bed two storey terraced houses) and 2no. Type D1 (two storey end terraced 5bed houses); the provision of solar photovoltaic panels (PV) on the roofs of the new dwellings, provision of all associated and ancillary site works, boundary treatments, new vehicular entrance and landscaping works to include the reinstatement of some historical pathways to the front of Glebe House, the conversion of the existing site entrance and driveway (to the front of Glebe House and adjacent to the Beeches Housing development) into a pedestrian/cycle route accessing Glebe House, the adjacent buildings and also the proposed development. Glebe House is listed on the record of Protected Structures in the Kildare County Development Plan 2017-2023. All