Planning Application: 21608 (Kildare County Council )
File Number:
21608
Application Type:
PERMISSION
Planning Status:
APPEALED
Received Date:
06/05/2021
Decision Due Date:
30/06/2021
Validated Date:
06/05/2021
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Refused
Decision Date:
30/06/2021
Leave to Appeal:
Appeal Date:
26/07/2021
Commenced Date:
Submissions By:
09/06/2021
Applicant Details
Applicant name:
Strategic Power Projects Limited,
Applicant Address:
Phone Number:
Fax Number:
23830796
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
a 10 year planning permission for the construction of: 1. An enclosed battery energy storage system compound on c. 4.089 ha with 76 no. battery storage units (each with associated containerised step-up transformer), 1 no. containerised control room and 1 no. containerised switch room, 1 no. containerised switchgear unit and CCTV cameras; 2. new site entrance off the L6044 and site access road; 3. site access road extension to a proposed substation site (proposed substation currently subject of a Strategic Infrastructure Development Pre-Application Consultation with An Bord Pleanála); and 4. all associated ancillary development works. The operational lifespan of the battery energy storage system will be 35 years. All
Development Address:
Dunnstown,, Co. Kildare.
Architect Name:
Brian Mackey - Malone O'Regan
Location Key:
DUNNSTOWN
Electoral Division:
Planner:
Fiona Breen
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
30/06/2021
Manager Order:
DO34453
Decision Type:
Refused
Number of Conditions:
3
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
Decision Description:
a 10 year planning permission for the construction of: 1. An enclosed battery energy storage system compound on c. 4.089 ha with 76 no. battery storage units (each with associated containerised step-up transformer), 1 no. containerised control room and 1 no. containerised switch room, 1 no. containerised switchgear unit and CCTV cameras; 2. new site entrance off the L6044 and site access road; 3. site access road extension to a proposed substation site (proposed substation currently subject of a Strategic Infrastructure Development Pre-Application Consultation with An Bord Pleanála); and 4. all associated ancillary development works. The operational lifespan of the battery energy storage system will be 35 years. All