File Number: | 2360077 | ||
Application Type: | PERMISSION | Planning Status: | APPLICATION FINALISED |
Received Date: | 31/07/2023 | Decision Due Date: | 25/04/2024 |
Validated Date: | 31/07/2023 | Invalidated Date: | |
Further Info Requested: | 22/09/2023 | Further Info Received: | 01/03/2024 |
Withdrawn Date: | Extend Date: | ||
Decision Type: | Conditional | Decision Date: | 25/04/2024 |
Leave to Appeal: | Appeal Date: | ||
Commenced Date: | Submissions By: | 04/04/2024 |
Applicant Details |
|||
---|---|---|---|
Applicant name: | Nua Manufacturing MMC Limited | ||
Applicant Address: | |||
Phone Number: | Fax Number: | ||
Corresp. Address: |
Proposed Development |
|||
---|---|---|---|
Development Description: | for a 7 year planning permission for development on a site of c. 23.4 hectares bounded generally by the M7/M7 Junction no. 13 to the north, residential development under construction (‘Grey Abbey View’) to the south, and the R415 to the east and undeveloped agricultural lands to the west. The development will consist of the construction of 2 no. light industrial buildings of c.61,472 sq. m (for the purpose of timber frame/light gauge steel manufacturing) A) All site clearance and enabling works required to facilitate the development; B) Building A (Factory unit A) will comprise c. 38,124 sq. m GFA) - height of c.17.1 metres (with a partial cladding element extending 1m above roofline on elevations up to 18.1m) and which includes 2,185 sq. m of support and staff welfare facilities, kitchen and dining facilities, warehouse/storage space, and ancillary office space at ground and first floor levels, water tanks, recycling area along with signage on elevations (2 no. types); C) Building B (Factory unit B) will comprise c. 23,348 sq. m GFA) - height of c.17.1 metres (with a partial cladding element extending 1m above roofline on elevations up to 18.1m) and which includes c. 2,185 sq. m of support and staff welfare facilities, kitchen and dining facilities, warehouse/storage space, and ancillary office space at ground and first floor level with signage on elevations (2 no. types); D) Provision of yards and recycling areas, along with loading bays, waste compactor and gated access points, and 2 no. ESB substations, (each with an overall GFA of 42.8 sqm) and the provision of 2 no. single storey security guard houses (each with a GFA of 29.8sqm); E) Access to the unit will be provided via a revised entrance onto the R415 and the provision of 622 no. car parking spaces, parking for 80 trucks/trailers, and 622 no. bicycle spaces; F) The development includes landscaping, boundary treatments, photovoltaic panels at roof level, entrance barriers, site lighting, and all associated site development works, including underground foul and storm water drainage services and attenuation areas, internal drainage diversions, culverts and all ancillary works; G) The development also consists of the reprofiling of the subject site to include an increase of ground levels at the site by up to circa 3m. The increase in ground levels will be facilitated through the importation of approximately 250,000m3 of infill material. For the avoidance of doubt, the imported infill material required to alter the ground levels will not be waste as defined by the Waste Management Act 1996 (as amended). An update to the Environmental Impact Assessment Report (EIAR) and Natura Impact Statement and Significant Further Information/Revised Plans have been furnished to the planning authority in respect of this proposed development and are available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the authority during public opening hours of the Planning Department. The significant further information relates to amendments to the overall site layout of the buildings (roundabouts, carparking, cycle lanes, bus stop and shelter, relocation of ESB substations), additional Sustainable urban drainage systems (green roofs, attenuation areas, swales), Buildings A and B (relocated storage tanks, elevation amendments, reduction in height of buildings, revised signage), revised cycle parking arrangements & reduction in truck parking (2 no. spaces). | ||
Development Address: | Lands at Nurney Road (R415), Greyabbey (townland), Kildare,, Co. Kildare | ||
Architect Name: | Location Key: | Kildare | |
Electoral Division: | Planner: | Louise Murphy | |
Social Housing Exempt: | Plan Enforcement #: | ||
IPC Licence Required: | No | Waste Licence Required: | No |
Protected Structure: | No | Protected Structure #: | |
Development Name: |
Comments |
|||
---|---|---|---|
Significant Case Flag: | Comments: |
Decision |
|||
---|---|---|---|
Decision Date: | 25/04/2024 | Manager Order: | CE52342 |
Decision Type: | Conditional | Number of Conditions: | 46 |
Grant Date: | 18/06/2024 | Grant Managers Order #: | CE52342 |
Section 47 Apply?: | Part 5 Apply?: | ||
Expiry Date: | 17/06/2031 | ||
Decision Description: | for a 7 year planning permission for development on a site of c. 23.4 hectares bounded generally by the M7/M7 Junction no. 13 to the north, residential development under construction (‘Grey Abbey View’) to the south, and the R415 to the east and undeveloped agricultural lands to the west. The development will consist of the construction of 2 no. light industrial buildings of c.61,472 sq. m (for the purpose of timber frame/light gauge steel manufacturing) A) All site clearance and enabling works required to facilitate the development; B) Building A (Factory unit A) will comprise c. 38,124 sq. m GFA) - height of c.17.1 metres (with a partial cladding element extending 1m above roofline on elevations up to 18.1m) and which includes 2,185 sq. m of support and staff welfare facilities, kitchen and dining facilities, warehouse/storage space, and ancillary office space at ground and first floor levels, water tanks, recycling area along with signage on elevations (2 no. types); C) Building B (Factory unit B) will comprise c. 23,348 sq. m GFA) - height of c.17.1 metres (with a partial cladding element extending 1m above roofline on elevations up to 18.1m) and which includes c. 2,185 sq. m of support and staff welfare facilities, kitchen and dining facilities, warehouse/storage space, and ancillary office space at ground and first floor level with signage on elevations (2 no. types); D) Provision of yards and recycling areas, along with loading bays, waste compactor and gated access points, and 2 no. ESB substations, (each with an overall GFA of 42.8 sqm) and the provision of 2 no. single storey security guard houses (each with a GFA of 29.8sqm); E) Access to the unit will be provided via a revised entrance onto the R415 and the provision of 622 no. car parking spaces, parking for 80 trucks/trailers, and 622 no. bicycle spaces; F) The development includes landscaping, boundary treatments, photovoltaic panels at roof level, entrance barriers, site lighting, and all associated site development works, including underground foul and storm water drainage services and attenuation areas, internal drainage diversions, culverts and all ancillary works; G) The development also consists of the reprofiling of the subject site to include an increase of ground levels at the site by up to circa 3m. The increase in ground levels will be facilitated through the importation of approximately 250,000m3 of infill material. For the avoidance of doubt, the imported infill material required to alter the ground levels will not be waste as defined by the Waste Management Act 1996 (as amended). An update to the Environmental Impact Assessment Report (EIAR) and Natura Impact Statement and Significant Further Information/Revised Plans have been furnished to the planning authority in respect of this proposed development and are available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the authority during public opening hours of the Planning Department. The significant further information relates to amendments to the overall site layout of the buildings (roundabouts, carparking, cycle lanes, bus stop and shelter, relocation of ESB substations), additional Sustainable urban drainage systems (green roofs, attenuation areas, swales), Buildings A and B (relocated storage tanks, elevation amendments, reduction in height of buildings, revised signage), revised cycle parking arrangements & reduction in truck parking (2 no. spaces). |
Appeal Details | |||
---|---|---|---|
Notification Date: | BP Reference #: | ||
Appeal Type: | File Forward Date: | ||
Submission Due Date: | Submission Sent Date: | ||
Appeal Decision: | Decision Date: | ||
Withdrawn Date: | Dismissed Date: | ||
Reason: |