Planning application details ref: 20638 Laois County Council

100%100% Complete (warning)

Planning Application: 20638 (Laois County Council )
File Number: 20638
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 04/12/2020 Decision Due Date: 05/12/2021
Validated Date: 04/12/2020 Invalidated Date:
Further Info Requested: 29/01/2021 Further Info Received: 08/11/2021
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 02/12/2021
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By: 21/11/2021

Applicant Details

Applicant name: The Electricity Supply Board
Applicant Address:
Phone Number: Fax Number:
Corresp. Address: One Dublin Airport Central,, Dublin Airport,, Cloghran,, Co. Dublin K67 XF72

Applicant Details


Proposed Development

Development Description: The proposed development will consist of construction of a 110 kV/MV electricity station on a c.O.74 ha site. The site will be surrounded by a 1.4 m post and rail fence. The substation itself will be located within a compound secured by a 2.6 m high palisade fence and gates and includes: (a) a two-storey control and switchgear building (c.623 sq.m and 15.2 m high); (b) jive transformers with bund walls and associated oil interceptors and NER plinth; (c) two house transformers; (d) two 15 m high lightning monopoles; (e) landscaping,parking, an internal access road and all ancillary works including; connections to public water supply and foul water services or a foul water holding tank if a fout water connection is not available; (f) overhead line (OHL) works including: one new poleset (c.15 m high)- this is required on a temporary basis to divert the 110 kV OHL during construction of the substation, it will be removed on completion of the substation. One existing 110 kV OHL structure within the substation site will be replaced by a line/cable interface mast to facilitate connection of the OHL into the new substation following its completion. The existing poleset to the south will be removed. Planning permission is being sought for a duration of 10 years. Note for information purposes: This application represents a resubmission of a similar application permitted (but now expired) by Laois County Council under Reg. Ref. 10/236. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
Development Address: Bracklone townland, Portarlington, Co. Laois
Architect Name: Brendan Allen Location Key: BRACKLONE STREET PORTARLINGTON
Electoral Division: Planner: Donal Kiely
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 02/12/2021 Manager Order: 913
Decision Type: Conditional Number of Conditions: 16
Grant Date: 03/06/2022 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 02/06/2027
Decision Description: The proposed development will consist of construction of a 110 kV/MV electricity station on a c.O.74 ha site. The site will be surrounded by a 1.4 m post and rail fence. The substation itself will be located within a compound secured by a 2.6 m high palisade fence and gates and includes: (a) a two-storey control and switchgear building (c.623 sq.m and 15.2 m high); (b) jive transformers with bund walls and associated oil interceptors and NER plinth; (c) two house transformers; (d) two 15 m high lightning monopoles; (e) landscaping,parking, an internal access road and all ancillary works including; connections to public water supply and foul water services or a foul water holding tank if a fout water connection is not available; (f) overhead line (OHL) works including: one new poleset (c.15 m high)- this is required on a temporary basis to divert the 110 kV OHL during construction of the substation, it will be removed on completion of the substation. One existing 110 kV OHL structure within the substation site will be replaced by a line/cable interface mast to facilitate connection of the OHL into the new substation following its completion. The existing poleset to the south will be removed. Planning permission is being sought for a duration of 10 years. Note for information purposes: This application represents a resubmission of a similar application permitted (but now expired) by Laois County Council under Reg. Ref. 10/236. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: