Planning Application: 18139 (Longford County Council)
File Number:
18139
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
28/06/2018
Decision Due Date:
22/08/2018
Validated Date:
28/06/2018
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
21/08/2018
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
01/08/2018
Applicant Details
Applicant name:
Eirgrid Plc. c/o Stephen Dunne
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
development at this site - the existing Cloon to Lanesboro 110 kV Overhead Line is approximately 65 kilometres long. Approximately 37km of the existing circuit is located within the functional area of Galway County Council with approximately 27km located in County Roscommon and approximately 120 metres located in County Longford. The refurbishment works within County Longford will be undertaken at structure EM365, located within the Lanesboro Substation in the townland of Aghamore (Rathcline By). The development will consist of the refurbishment of the Cloon - Lanesboro 110 kV Overhead Line which will primarily include: replacement of a large proportion of existing structures, the breaking out and reconstruction of the concrete foundation and shear blocks at the majority of end/angle mast structures, painting of mast structures, replacement of insulators, crossarms, stays and/or fittings on existing structures; and the fitting of bird flight diverters and stay guards. No additional structures are proposed along the existing circuit. Any replacement structures will be constructed at, or immediately adjacent to the existing structures they will replace, and will be of a generally similar height and appearance. Associated site development works to gain access to the existing structures include clearance of vegetation, disassembly and reassembly of stone walls and gate posts and removal and reinstatement of existing fencing. The proposed development includes all other associated and ancillary site development works required for the refurbishment of the existing circuit, including the installation of temporary silt traps, silt fences, bog mats and clear span bridges. No additional structures and no alteration to the nature, extent, alignment, character or voltage of the existing electricity infrastructure is proposed. A Natura Impact Statement (NIS) forms part of this application
Development Address:
Aghamore (Rathcline By),, Co. Longford.
Architect Name:
Location Key:
AGHAMORE
Electoral Division:
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
21/08/2018
Manager Order:
28175
Decision Type:
Conditional
Number of Conditions:
7
Grant Date:
27/09/2018
Grant Managers Order #:
28175
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
26/09/2023
Decision Description:
development at this site - the existing Cloon to Lanesboro 110 kV Overhead Line is approximately 65 kilometres long. Approximately 37km of the existing circuit is located within the functional area of Galway County Council with approximately 27km located in County Roscommon and approximately 120 metres located in County Longford. The refurbishment works within County Longford will be undertaken at structure EM365, located within the Lanesboro Substation in the townland of Aghamore (Rathcline By). The development will consist of the refurbishment of the Cloon - Lanesboro 110 kV Overhead Line which will primarily include: replacement of a large proportion of existing structures, the breaking out and reconstruction of the concrete foundation and shear blocks at the majority of end/angle mast structures, painting of mast structures, replacement of insulators, crossarms, stays and/or fittings on existing structures; and the fitting of bird flight diverters and stay guards. No additional structures are proposed along the existing circuit. Any replacement structures will be constructed at, or immediately adjacent to the existing structures they will replace, and will be of a generally similar height and appearance. Associated site development works to gain access to the existing structures include clearance of vegetation, disassembly and reassembly of stone walls and gate posts and removal and reinstatement of existing fencing. The proposed development includes all other associated and ancillary site development works required for the refurbishment of the existing circuit, including the installation of temporary silt traps, silt fences, bog mats and clear span bridges. No additional structures and no alteration to the nature, extent, alignment, character or voltage of the existing electricity infrastructure is proposed. A Natura Impact Statement (NIS) forms part of this application