File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
1838 |
APPLICATION FINALISED |
PERMISSION |
C |
22/01/2018 Monday |
Health Service Executive CH08 Louth Primary Care |
Muirhevnamor Primary Care centre Muirhevnamor Dundalk |
Permission for development will consist of permission for signage (area = 3.72m2) to the north facing elevation of an existing building and associated site development works. |
22497 |
APPLICATION FINALISED |
PERMISSION |
R |
20/06/2022 Monday |
Alan Haughey, Michael Shields, Eoin Murdock |
Grange Close Muirhevnamor Dundalk, Co Louth |
Permission for the demolition of the existing commercial unit and the construction of a six storey apartment block made up of 4 x one bedroom apartments, 11 x two bedroom apartments, 4 x three bedroom apartments (19 apartments in total), bin storage, bicycle storage, communications room, new boundary treatments including associated hard and soft landscaping, connection to the existing mains sewer, new onsite surface water attenuation system and associated site development works |
22889 |
APPLICATION FINALISED |
PERMISSION |
R |
16/11/2022 Wednesday |
Alan Haughey, Michael Shields and Eoin Murdock |
Grange Close Muirhevnamor Dundalk, Co Louth |
Permission for the demolition of the existing commercial unit and the construction of a two storey residential unit made up of 2 x one bedroom apartments and 4 x two bedroom aparmtents (6 apartments in total), secure bin storage, bicycle storage, new boundary treatments including associated hard and soft landscaping, connection to the existing mains sewer, new on site surface water attenuation system, associated carparking and associated site development works |
2360278 |
APPLICATION FINALISED |
PERMISSION |
R |
11/08/2023 Friday |
Alan Haughey, Michael Shields, Eoin Murdock |
Grange Close Muirhevna Mor Dundalk |
Permission for the demolition of the existing commercial unit and the construction of a three storey residential unit made up 6 x two bedroom apartments (6 apartments in total), secure bin storage, bicycle storage, new boundary treatments including associated hard and soft landscaping, connection to the existing mains sewer, new on site surface water attenuation system, associated carparking and associated site development works |