File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
08520212 |
APPLICATION FINALISED |
PERMISSION |
C |
07/11/2008 Friday |
FINNABAIR ESTATES LIMITED |
MARSHES UPPER INNER RELIEF ROAD DUNDALK |
THE DEVELOPMENT WILL CONSIST OF A ONE NUMBER STOREY, TEN SCREEN COMMERCIAL CINEMA BUILDING (4,050 SQUARE METRES) ON A SITE OF CIRCA 1.422 HECTARES CONSISTING OF 1,800 SEATS. SCREEN 1 WILL CONSIST OF 120 NUMBER SEATS, SCREEN 2 WILL CONSIST OF 151 NUMBER SEATS, SCREEN 3 WILL CONSIST OF 149 NUMBER SEATS, SCREEN 4 WILL CONSIST OF 185 NUMBER SEATS, SCREEN 5 & 6 WILL CONSIST OF 316 NUMBER SEATS RESPECTIVELY, SCREEN 7 WILL CONSIST OF 185 NUMBER SEATS, SCREEN 8 WILL CONSIST 149 NUMBER SEATS, SCREEN 9 WILL CONSIST OF 110 SEATS AND SCREEN 10 WILL CONSIST OF 194 SEATS. 1 NUMBER ANCILLARY CONCESSIONS AREA OF 500 NUMBER SQUARE METRES, 1 NUMBER VIP CAFE OF 160 NUMBER SQUARE METRES AND ANCILLARY TOILETS. WORKS WILL INCLUDE THE EXTENSION OF THE EXISTING 6 METRE WIDE SERVICE CARRIAGEWAY TO THE EAST OF THE SITE AND PROVISION OF A TURNING CIRCLE, THE PROVISION OF A FOOTPATH OF 1.8M WIDE TO THE NORTH, EAST AND SOUTH OF THE SITE, PROVISION OF SHARED SURFACE PAVING TO THE WEST OF THE SITE, RELOCATION OF THE EXISTING ELECTRICITY SUB STATION FROM THE SOUTH EASTERN CORNER OF THE ICE DOME TO THE EAST OF THE PROPOSED CINEMA, COMPLETE HARD AND SOFT LANDSCAPING, PROVISION OF 10 NUMBER PARENT AND CHILD CAR PARKING SPACES, REVISED BOUNDARY TREATMENT AND GENERAL SITE WORKS. |
09520034 |
INCOMPLETED APPLICATION |
PERMISSION |
|
03/03/2009 Tuesday |
FINNABAIR ESTATES LIMITED |
DUNDALK RETAIL & LEISURE PARK (PHASE2B) INNER RELIEF ROAD MARSHES UPPER |
THE DEVELOPMENT WILL CONSIST OF RETAIL (14,027SQM), LEISURE (7,468SQM) AND RESTAURANT/ CATERING (2,028SQM) USES TOTALING 23,543SQM ON A SITE OF CIRCA 15.25 HECTARES, THAT WILL COMPLEMENT THE EXISTING ADJACENT USES NAMELY THE JJB SOCCER DOME, ICE DOME AND KFC FAST FOOD OUTLET. THE RETAIL COMPONENT OF THE DEVELOPMENT WILL BE ACCOMMODATED IN 8 NUMBER RETAIL UNITS 914,027SQM) RANGING IN SIZE FROM 700SQM TO 4,284SQM INCLUDING AN OUTDOOR RETAIL AREA OF 938SQM. THE LEISURE COMPONENT WILL CONSIST OF ONE NUMBER FAMILY ENTERTAINMENT CENTRE (7,290SQM) OVER TWO LEVELS, WITH AN ANCILLARY MANAGEMENT AREA (178SQM). THE DEVELOPMENT WILL ALSO COMPRISE ELEVATIONAL AND FRONTAGE MODIFICATIONS TO THE CINEMA AS PROPOSED BY (PA 08/212). THE RESTAURANT/ CATERING COMPONENT OF THE DEVELOPMENT WILL BE ACCOMMODATED IN EIGHT NUMBER UNITS (2,028SQM) RANGING IN SIZE FROM 145SQM TO 390SQM. WORKS WILL INCLUDE COMPLETE HARD AND SOFT LANDSCAPING INCLUDING THE CREATION OF A PUBLIC AREA WITH ASSOCIATEDLANDSCAPING SURROUNDING A MAN MADE WATER FEATURE WHICH WILL PROVIDE A FOCAL POINT FOR THE DEVELOPMENT, THE PROVISION OF BICYCLE STANDS, PLANT AREAS, ESB SUBSTATION, WASTE MANAGEMENT FACILITIES, REVISED BOUNDARY TREATMENT AND ASSOCIATED SITE WORKS. TRANSPORTATION WORKS WILL INCLUDE MODIFICATIONS TO THE EXISTING HIGHWAY TO ACCOMMODATE ADDITIONAL TRAFFIC. THE ROUNDABOUT AT THE JUNCTION OF THE N52 INNER RELIEF ROAD AND HOEY'S LANE WILL BE REDESIGNED TO PROVIDE A FULLY SIGNALISED ROUNDABOUT JUNCTION. HOEY'S LANE EAST (LINK ROAD) BETWEEN THE N52 NEW SIGNALISED ROUNDABOUT AND THE INTERNAL SITE ROUNDABOUT WILL BE WIDENED TO TWO LANES IN EACH DIRECTION WITH A CLOSED CENTRAL RESERVE. THE LINK ROAD WILL ADDITIONALLY BE WIDENED WITH A DEDICATED LEFT TURNING LANE THAT BYPASSES THE SIGNALISED ROUNDABOUT FOR TRAFFIC HEADING SOUTH. ACCESS FOR SERVICING WILL ALSO BE PROVIDED VIA A DEDICATED SERVICE ACCESS TO THE REAR OF THE EXISTING DEVELOPMENT (JJB SOCCER DOME, ICE DOME). THE RECONFIGURATION AND EXPANSION OF THE EXISTING CAR PARK, WHICH CURRENTLY PROVIDES 1,053 CAR PARKING SPACES, WILL PROVIDE 1,162 PARKING SPACES INCLUDING 39 DISABLED AND 80 STAFF SPACES. AN ENVIRONMENTAL IMPACT STATEMENT WILL BE SUBMITTED AS PART OF THIS APPLICATION |
09520041 |
APPLICATION FINALISED |
PERMISSION |
C |
13/03/2009 Friday |
FINNABAIR ESTATES LIMITED |
DUNDALK RETAIL AND LEISURE PARK (PHASE 2B) INNER RELIEF ROAD MARSHES UPPER |
THE DEVELOPMENT WILL CONSIST OF RETAIL (14,027 SQ.M), LEISURE (7,468 SQ.M) AND RESTAURANT/CATERING (2,028 SQ.M) USES TOTALING 23,543 SQ.M ON A SITE OF CIRCA 15.25 HECTARES, THAT WILL COMPLEMENT THE EXISTING ADJACENT USES NAMELY THE JJB SOCCER DOME, ICE DOME AND KFC FAST FOOD OUTLET. THE RETAIL COMPONENT OF THE DEVELOPMENT WILL BE ACCOMMODATED IN 8 NUMBER RETAIL UNITS (14,027 SQ.M) RANGING IN SIZE FROM 700 SQ.M TO 4,284 SQ.M INCLUDING AN OUTDOOR RETAIL AEA OF 938 SQ.M. THE LEISURE COMPONENT WILL CONSIST OF ONE NUMBER FAMILY ENTERTAINMENT CENTRE (7,290 SQ.M) OVER TWO LEVELS, WITH AN ANCILLARY MANAGEMENT AREA (178 SQ.M). THE DEVELOPMENT WILL ALSO COMPRISE ELEVATIONAL AND FRONTAGE MODIFICATIONS TO THE CINEMA AS PROPOSED BY PA 08/212. THE RESTAURANT/CATERING COMPONENT OF THE DEVELOPMENT WILL BE ACCOMMODATED IN EIGHT NUMBER UNITS (2,028 SQ.M) RANGING IN SIZE FROM 145 SQ.M TO 390 SQ.M. WORKS WILL INCLUDE COMPLETE HARD AND SOFT LANDSCAPING INCLUDING THE CREATION OF A PUBLIC AREA WITH ASSOCIATED LANDSCAPING SURROUNDING A MAN MADE WATER FEATURE WHICH WILL PROVIDE A FOCAL POINT FOR THE DEVELOPMENT, THE PROVISION OF BICYCLE STANDS, PLANT AREAS, ESB SUBSTATION, WASTE MANAGEMENT FACILITIES, REVISED BOUNDARY TREATMENT AND ASSOCIATED SITE WORKS. TRANSPORTATION WORKS WILL INCLUDE MODIFICATIONS TO THE EXISTING HIGHWAY TO ACCOMMODATE ADDITIONAL TRAFFIC. THE ROUNDABOUT AT THE JUNCTION OF THE N52 INNER RELIEF ROAD AND BOTHAR NA FEIRME WILL BE REDESIGNED TO PROVIDE A FULLY SIGNALISED ROUNDABOUT JUNCTION. BOTHAR NA FEIRME BETWEEN THE N52 NEW SIGNALISED ROUNDABOUT AND THE SITE ENTRANCE ROUNDABOUT WILL BE WIDENED TO TWO LANES IN EACH DIRECTION WITH A CLOSED CENTRAL RESERVE. THE LINK ROAD WILL ADDITIONALLY BE WIDENED WITH A DEDICATED LEFT TURNING LANE THAT BY-PASSES THE SIGNALISED ROUNDABOUT FOR TRAFFIC HEADING SOUTH. ACCESS FOR SERVICING WILL ALSO BE PROVIDED VIA A DEDICATED SERVICE ACCESS TO THE REAR OF THE EXISTING DEVELOPMENT (JJB SOCCER DOME, ICE DOME). THE RECONFIGURATION AND EXPANSION OF THE EXISTING CAR PARK, WHICH CURRENTLY PROVIDES 1,053 CAR PARKING SPACES, WILL PROVIDE 1,162 PARKING SPACES INCLUDING 39 DISABLED AND 80 STAFF SPACES. AN ENVIRONMENTAL IMPACT STATEMENT WILL BE SUBMITTED AS PART OF THIS APPLICATION AND WILL BE AVAILABLE FOR INSPECTION OR PURCHASE AT A FEE NOT EXCEEDING THE REASONABLE COST OF MAKING A COPY DURING THE OFFICE HOURS AT THE OFFICES OF THE PLANNING AUTHORITY |
19103 |
APPLICATION FINALISED |
PERMISSION |
C |
15/02/2019 Friday |
Louth GAA County Board (Aidan Berrill) |
Marshes Upper Inner Relief Road Dundalk |
Permission for development to consist of raising the existing level of lands with imported engineering grade fill material in order to facilitate the future construction of a sports stadium. The works will include the provision of a temporary site entrance, temporary security fencing, temporary internal haul roads, temporary wheel wash and all associated site development works. *Significant Further Information Received on 09/05/2019* |