THE DEVELOPMENT WILL CONSIST OF THE CONVERSION OF PART OF THE EXISTING FACTORY INTO 712SQM OF OFFICES AND RESEARCH FACILITIES ON THE APPLICATION SITE OF 6.55 HECTARES. THE WORK CONSISTS OF MODIFYING THE INTERIOR AND STRIPPING OUT OF INTERNAL WALLS AND THE CLEANING DOWN OF EXISTING COLUMNS AND ROOF TRUSSES. THE EXTERNAL WORK INVOLVES THE REMOVAL OF THE LOADING BAYS BETWEEN GRID 1.A AND L.D AND 4NO. BRICK FACED BAYS ON THE EAST ELEVATION AND 2NO. BAYS ON THE SOUTH ELEVATION. ALL ARE TO BE REPLACED WITH NEW WINDOWS AND DOORS. THE EXISTING WALLS ARE TO BE CLEANED AND NEW CILLS ADDED. THE WORKS ARE ALSO TO INCLUDE A NEW BACKLIT SIGN AND ALL ASSOCIATED SITE SERVICES AND LANDSCAPING.THIS DEVELOPMENT CONSISTS OF WORK TO A PROTECTED STRUCTURE REF. NO. D182
THE DEVELOPMENT WILL CONSIST OF THE CONVERSION OF PART OF THE EXISTING FACTORY INTO 784SQM OF RESEARCH FACILITIES ON THE APPLICATION SITE OF 6.55 HECTARES. THE WORK CONSISTS OF MODIFYING THE INTERIOR AND STRIPPING OUT OF INTERNAL WALLS AND PAINTING OF EXISTING COLUMNS AND ROOF TRUSSES. THE EXTERNAL WORK INVOLVES THE REMOVAL OF 2NO. BRICK FACED BAYS ON THE SOUTH ELEVATION WHICH ARE TO BE REPLACED WITH NEW WINDOWS AND DOORS. THE EXISTING WALLS ARE TO BE CLEANED AND NEW CILLS ADDED. THE WORKS ARE ALSO TO INCLUDE A NEW REVOLVING DOOR TO THE NORTH ENTRANCE AREA, THE REMOVAL OF 1NO. BRICK FACED BAY ON THE EAST ELEVATION REPLACED WITH NEW WINDOWS AND ALL ASSOCIATED SITE SERVICES AND LANDSCAPING. FORMER CARROLL'S FACTORY BUILDING, A PROTECTED STRUCTURE REF. NO. D182.
permission for development at the former Carroll's Factory Building, a protected structure, ref. no. D182. The development will consist of the conversion of part of the former Carroll's Factory Building and the associated former Energy Centre building into 1231sqm of Apprenticeship Teaching Facilities. The Carroll's building works consist of modifying the interior, stripping out of internal walls and the formation of plumbing and electrical apprenticeship areas and a new mezzanine office area. The removal of 2 no. brick faced bays on the south façade and insertion of new glazing, doors and ramps. Energy Centre building works consist of stripping off the existing roof covering and replacing with new membrane roofing system, new fall arrest system, access hatch and services, insertion of new entrance doors, exit doors, new ramps, stripping out of redundant services, modification to floor, and new roof access ladder. Brickwork walls to the refurbished area are to be cleared and a cill added below glazing. Works to the Research Lab include a 2.4m high partition. Works in the service compound area include installation of a 4.2m high tank. Permission also sough for 8 no. cycle parking spaces and all associated site development works
No Environment Impact Assesments Associated with this Application