THE DEVELOPMENT CONSISTS OF CHANGE OF USE OF EXISTING COMMERCIAL MUSHROOM TUNNELS TO BE RECOVERED FOR USE AS POLYTUNNELS AND SERVICE BUILDING TO BE CONVERTED TO OFFICE AND CANTEEN AND ALL ASSOCIATED SITE WORKS
Ag an Laithrean Riasca Thuaidh Dun Dealgan Contae Lu
Cead forbartha a lorg. Is iad na rudai a bheadh togtha ann na: A. Ionad garrai scoir 25 uimh. 10m x 6m gach ceann B. 4 uimh. polathollain, 25m x 10m gach ceann. C. Gairdin lasmuigh, ionad plandaithe & ionad taispeantas chomh maith le banc "Fag Anseo". D. Foirgneamh aon stor amhain a thogail, cuntar poibli, ceaintin, oifig agus leithris. E. uirlisi gairdin/ trealamh garraiodoireachta. F. Coireail teorann na himline & an oinaid ar chul & I dtaobh an ionaid, agus ba choir plandu de chrainn a cineal roghnaithe / duchais. G. Pairceail phoibli & bealach isteach ar bhothar poibli ata ann cheana fein agus gach seirbhis bhreise. Ta Raiteas Tionchar natura ullmhaithe I leith an iarratais phleanala.*******We, Seosamh (Sóisearach) Ó Donnaile & associates, intend to apply for planning permission at the site North Marsh, Dundalk, Co. Louth. The proposed development consists of:
A. an allotment area of 25 separate allotments of 10m x 6m each B. 4No. polytunnels, 25m x 10m each C. Outdoor garden, planting area & display area and also a bring bank unit D. Single-storey building with public counter, canteen, office and toilet.
E. Store for tools / equipment
F. Boundary treatment to perimeter and area to rear & side with the provision of planting of selected/native trees G. Public parking and vehicular entrance from existing public road and ancillary services.
A natura impact statement has been prepared in relation to the planning application.
**Significnat Further Information received on 23/12/13 amended the development as follows (a) Revised Natura Impact Statement (b) Revised site layout showing increase in size of the tool store & omission of office/shop (c) Site resolution plan (d) Revised flood Impact Assessment.
Permission for the widening of the existing horse racing track at two sections and the provision of fences for jump racing, along with the installation of 2 no. oil tanks and boiler containers for undersoil heating to the new area of track*** Significant further information lodged 24/07/2014 included Natura Impact Statement***
No Environment Impact Assesments Associated with this Application