to amend the design of the approved development (Planning Reference TA/180167) which comprises consent for a Solar PV Energy Development. Proposed amendments include; (1) Customer Substation to be relocated and decrease in size, (2) Number of Inverters to be reduced, (3) 1no Inverter to decrease in size, (4) Minor changes to the panel layout, (5) Slight alteration to the access tracks, (6) Battery Containers to be removed, (7) Slight alteration to the layout of the Deer Fencing and (8) Project Lifetime proposed to be extended from 30 to 35 years
permission to amend the design of the approved development (Planning Reference TA/180167) which comprises consent for a Solar PV Energy Development. Proposed amendments include; (1) Customer Substation to be relocated and decrease in size, (2) Number of Inverters to be reduced, (3) 1no Inverter to decrease in size, (4) Minor changes to the panel layout, (5) Slight alteration to the access tracks, (6) Battery Containers to be removed, (7) Slight alteration to the layout of the Deer Fencing and (8) Project Lifetime proposed to be extended from 30 to 35 years
construction of a detached one and a half storey dormer bungalow, entrance and access road, AQUAmax effluent treatment system and septic tank and percolation area and associated site works on my lands
the construction of a detached one and a half storey dormer bungalow, entrance and access road, AQUAmax effluent treatment system and septic tank and percolation area and associated site work on my lands
the development will consist of solar PV arrays with a surface area of approximately 31,000m2 mounted on steel support structures, associated underground cabling and ducting, grid control building, 2 No. inverter/transformer cabins, 2 no. battery enclosures, site entrance, access tracks, hardstanding area, boundary security fence, CCTV, landscaping and ancillary works. The solar PV arrays will have a height above ground level of up to 3m and an export electrical capacity of up to 4 megawatts. An appropriate period of 10 years (i.e. duration of the planning permission to construct the development) is sought, with an operational life of 25 years after that date of commissioning
No Environment Impact Assesments Associated with this Application