the proposed development will consist of (i) change of four bedroom detached house type on sites 13 & 21 as previously granted planning permission under ref. 21/1532 and revise location of these two houses; (ii) revision to the site layout plan granted planning permission for 41 no. dwelling houses under planning register ref. 21/1532 including the addition of 2 no. four bedroom two storey semi-detached dwelling houses, 2 no. three bedroom two storey semi-detached dwelling houses and 6 no. two bedroom single storey semi-detached dwelling houses (a total addition of 10. houses to the development already permitted); revision to site/unit numbering for the overall development and (iii) associated revisions to underground services and internal road design
Development Address:
Summerhill , Co. Meath
Architect Name:
Ivan O'Daly
Location Key:
SUMMERHILL
Electoral Division:
Incorrect Icl Voter Recor
Planner:
Frank O'Donnell
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
21/11/2022
Manager Order:
1972/22
Decision Type:
Conditional
Number of Conditions:
15
Grant Date:
13/01/2023
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
09/03/2027
Decision Description:
the proposed development will consist of (i) change of four bedroom detached house type on sites 13 & 21 as previously granted planning permission under ref. 21/1532 and revise location of these two houses; (ii) revision to the site layout plan granted planning permission for 41 no. dwelling houses under planning register ref. 21/1532 including the addition of 2 no. four bedroom two storey semi-detached dwelling houses, 2 no. three bedroom two storey semi-detached dwelling houses and 6 no. two bedroom single storey semi-detached dwelling houses (a total addition of 10. houses to the development already permitted); revision to site/unit numbering for the overall development and (iii) associated revisions to underground services and internal road design
South of Summerhill Industrial Estate and to the North of the R156 Summerhill, Co. Meath
the construction of 41 no. two storey dwelling houses comprising 4 no. 3 bedroom semi-detached houses, 8 no. 4 bedroom semi-detached houses and 29 no. 4 bedroom detached houses with optional single storey sunrooms to the rear of units 15-19 and 36-40, new access to R156 public road, removal of existing trees and hedgerow along Western boundary to allow for provision of new grass verge and path along access road to Summerhill Industrial Estate, removal of temporary sewage treatment plant (not used) on site, new connection line to existing public foul sewer pumping station located to the North, landscaping and all associated site works. Significant further information/revised plans submitted on this application
No Environment Impact Assesments Associated with this Application