amendments to previously approved planning permissions (RA/170966, RA/181201 & 21/2210). The amendmnets for which permission is sought include (1) replacement of the previously proposed mono pitched "saw-tooth" roof design to the dwelling with a pitched roof design including an extended overhang to the side (West) of the living area for a BBQ/outdoor seating area and the introduction of a hipped gable roof in lieu of the previously proposed gable wall on the Northeast corner (2) relocated and enlarged double vehicular bay domestic garage with ridge height matching that of the proposed dwelling roof, together with all ancillary site works, landscaping and site drainage
Development Address:
Glascarn Lane, Glascarn, Ratoath, Co Meath
Architect Name:
Location Key:
GLASCARN
Electoral Division:
Incorrect Icl Voter Recor
Planner:
Donal Farrelly
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
13/02/2023
Manager Order:
208/23
Decision Type:
Conditional
Number of Conditions:
6
Grant Date:
28/03/2023
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
22/01/2024
Decision Description:
amendments to previously approved planning permissions (RA/170966, RA/181201 & 21/2210). The amendments for which permission is sought include (1) replacement of the previously proposed mono pitched "saw-tooth" roof design to the dwelling with a pitched roof design including an extended overhang to the side (West) of the living area for a BBQ/outdoor seating area and the introduction of a hipped gable roof in lieu of the previously proposed gable wall on the Northeast corner (2) relocated and enlarged double vehicular bay domestic garage with ridge height matching that of the proposed dwelling roof, together with all ancillary site works, landscaping and site drainage
development consists of (1) To Construct one storey type dwelling and domestic garage. (2) To construct new site entrance. (3) Connect to public mains services and complete all ancillary site works