the development will consist of (i) a new above-ground treated water reservoir on top of an earthen embankment with associated connection, scour and overflow pipework; (ii) a control building housing a secondary chlorination facility and welfare facility, together with all associated and ancillary works; (iii) an attenuation pond; (iv) solar panels on the roof of the proposed reservoir, the roof of the proposed control building, and the roof of the existing earthen embankment rectangular reservoir; and (v) all ancillary development including entrance on to the public road, groundworks, security fencing, lighting, landscaping, SuDS drainage system and mechanical and electrical service connections
the development will consist of (i) a new above-ground treated water reservoir on top of an earthen embankment with associated connection, scour and overflow pipework; (ii) a control building housing a secondary chlorination facility and welfare facility, together with all associated and ancillary works; (iii) an attenuation pond; (iv) solar panels on the roof of the proposed reservoir, the roof of the proposed control building, and the roof of the existing earthen embankment rectangular reservoir; and (v) all ancillary development including entrance on to the public road, groundworks, security fencing, lighting, landscaping, SuDS drainage system and mechanical and electrical service connections
a 10 year permission for development on lands in the townland of Irishtown, Kilbrew, Co. Meath. The development will consist of the construction of an up to 8.7 MW solar PV farm comprising approximately 27,800 no. photovoltaic panels on ground mounted frames within a site area of 10.82 hectares and associated ancillary development including 8 no. transformer stations, 8 no. auxiliary transfomer stations, 8 no. inverters, 1 no. single storey storage building, 1 no. single storey communications building, 1 no. single storey client building, 3 no. CCTV security cameras mounted on 4 metre high poles and perimeter security fencing (2 metres high);1 no. single storey client side substation (DNO) and 1 no. CCTV security camera mounted on a 4 metre high pole on a 0.04 hectare site on the eastern side of the landholding to the east of the area of the photovoltaic panels; the construction of a vehicular access from the adjoining L5003-44 road; and the construction of a hardcore access track between the area of the photovoltaic panels, the client side substation and the proposed road access point (0.19 hectares)
No Environment Impact Assesments Associated with this Application