(1) demolition of the existing storage shed; (2) erection of a new two-storey storage and adminstrative building, including water treatment plant (429m2) and renewable energy centre (23m2); (3) removal of the temporary container staff accommodation and (4) associated site works. This is a protected structure
the development will consist of proposed works for: 1) demolition of the existing storage shed; 2) erection of a new two-storey storage and adminstrative building, including water treatment plant (429m2) and renewable enery centre (23m2); 3) removal of the temporary container staff accommodation and 4) associated site works. This is a protected structure
(1) demolition of the existing storage shed; (2) erection of a new two-storey storage and administrative building, including water treatment plant (429m2) and renewable energy centre (23m2); (3) removal of the temporary container staff accommodation and (4) associated site works. This is a protected structure