Planning application details ref: 2460514 Meath CoCo

100%100% Complete (warning)

Planning Application: 2460514 (Meath CoCo)
File Number: 2460514
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 10/07/2024 Decision Due Date: 21/01/2025
Validated Date: 10/07/2024 Invalidated Date:
Further Info Requested: 02/09/2024 Further Info Received: 16/12/2024
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 20/01/2025
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By:

Applicant Details

Applicant name: Department of Education
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: the development will consist of the construction of phase 2 extensions to the existing school to increase capacity from 450 to 1,000 pupils. The proposed extensions include: a 2-storey east block comprising of PE hall, gym, changing facilities, 4 specialist classrooms, 3 general classrooms, and office with sanitary and ancillary accommodation. A 2-storey west block comprising of 17 general classrooms, 4 specialist classrooms, Library, offices, Staff Room, pedestrian link with sanitary and ancillary accommodation. Existing internal renovations to coincide with the new extension to provide 1 general classroom, 1 specialist classroom and pedestrian link circulation. 23m2 Singe storey extension to the existing Boiler plant room. Total floor area of phase 2 extension C. 5045m2 Proposed site works to include the construction of new 25m2 standalone ESB sub-station, 115m x 80m grass pitch, the removal of 3 no. existing ball courts to be replaced with hard play area, 4 no. basketball courts, 48m2 external compound for Heat Pumps & Gas tank, bicycle stand for 138 bicycles, 37 no. car park spaces together with boundary treatment, ancillary infrastructure works and landscaping.
Development Address: Coláiste De Lacy, Ashbourne Education Campus, Ballybin, Ashbourne, Co. Meath., A84TW90
Architect Name: Location Key: BALLYBIN
Electoral Division: Incorrect Icl Voter Recor Planner: Peadar McQuaid
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 20/01/2025 Manager Order: 95/25
Decision Type: Conditional Number of Conditions: 11
Grant Date: 04/03/2025 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 03/03/2030
Decision Description: the development will consist of the construction of phase 2 extensions to the existing school to increase capacity from 450 to 1,000 pupils. The proposed extensions include: a 2-storey east block comprising of PE hall, gym, changing facilities, 4 specialist classrooms, 3 general classrooms, and office with sanitary and ancillary accommodation. A 2-storey west block comprising of 17 general classrooms, 4 specialist classrooms, Library, offices, Staff Room, pedestrian link with sanitary and ancillary accommodation. Existing internal renovations to coincide with the new extension to provide 1 general classroom, 1 specialist classroom and pedestrian link circulation. 23m2 Singe storey extension to the existing Boiler plant room. Total floor area of phase 2 extension C. 5045m2 Proposed site works to include the construction of new 25m2 standalone ESB sub-station, 115m x 80m grass pitch, the removal of 3 no. existing ball courts to be replaced with hard play area, 4 no. basketball courts, 48m2 external compound for Heat Pumps & Gas tank, bicycle stand for 138 bicycles, 37 no. car park spaces together with boundary treatment, ancillary infrastructure works and landscaping.

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: