development will consist of the demolition of an existing fire damaged dwelling and replacing it with a proposed new dormer dwelling house repositioned on the site, close up existing vehicular entrance and relocate new entrance onto public roadway, replace and upgrade existing septic tank with a proposed new waste water treatment system and percolation area to EPA regulations, existing connection to existing mains water supply and all ancillaries
Development Address:
FLemingstown, Balrath, Navan, Co. Meath
Architect Name:
Location Key:
FLEMINGSTOWN
Electoral Division:
Planner:
Billy Joe Padden
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
09/10/2019
Manager Order:
A1544/19
Decision Type:
Number of Conditions:
0
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
18/03/2025
Decision Description:
development will consist of the demolition of an existing fire damaged dwelling and replacing it with a proposed new dormer dwelling house repositioned on the site, close up existing vehicular entrance and relocate new entrance onto public roadway, replace and upgrade existing septic tank with a proposed new waste water treatment system and percolation area to EPA regulations, existing connection to existing mains water supply and all ancillaries
EXTENSION OF DURATION OF PLANNING APPLICATION REF NO: AA/141110 - the demolition of an existing fire damaged dwelling and replacing it with a proposed new dormer dwelling house repositioned on the site, close up existing vehicular entrance and relocate new entrance onto public roadway, replace and upgrade existing septic tank with a proposed new waste water treatment system and percolation area to EPA regulations, existing connection to existing mains water supply and all ancillaries
development will consist of the demolition of an existing fire damaged dwelling and replacing it with a proposed new dormer dwelling house repositioned on the site, close up existing vehicular entrance and relocate new entrance onto public roadway, replace and upgrade existing septic tank with a proposed new waste water treatment system and percolation area to EPA regulations, existing connection to existing mains water supply and all ancillaries
No Environment Impact Assesments Associated with this Application