the construction of PV panels mounted on metal frames, new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, a temporary construction compound, battery storage containers, power transformer stations and all ancillary grid infrastructure and associated works
Development Address:
Doghtog & Crackenstown, Co. Meath
Architect Name:
NEO Environmental Ltd
Location Key:
DOGHTOG
Electoral Division:
Incorrect Icl Voter Recor
Planner:
Terence Loane
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
16/12/2020
Manager Order:
A2193/20
Decision Type:
Conditional
Number of Conditions:
27
Grant Date:
04/02/2021
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
03/02/2026
Decision Description:
The construction of PV panels mounted on metal frames, new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, a temporary construction compound, battery storage containers, power transformer stations and all ancillary grid infrastructure and associated works
the development of a solar photovoltaic panel array comprising up to 61, 600 no. solar panels on ground mounted steel frames, 1 no. on site 38 kV substation (consisting of single storey substation control building, transformers, battery storage container and associated cabling and infrastructure), 15 no. electrical transformer/invertor station modules, underground cable ducts, hardstanding areas, perimeter fencing and security gates, access tracks, CCTV and all associated site services and works on a site area of 52.2 hectares, located in the townlands of Doghtog, Crakenstown and Bodeen, Ratoath, Co. Meath. Permission is also sought for a change of use of the existing entrance from the R155 to facilitate temporary construction access. Permission is sought for 10 years. Significant further information/revised plans submitted on this application