Planning application details ref: KA101227 Meath CoCo

100%100% Complete (warning)

Planning Application: KA101227 (Meath CoCo)
File Number: KA101227
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 26/10/2010 Decision Due Date: 20/12/2010
Validated Date: 26/10/2010 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 17/12/2010
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By:

Applicant Details

Applicant name: The Flood Group
Applicant Address:
Phone Number: Fax Number: 049 8541311
Corresp. Address:

Applicant Details


Proposed Development

Development Description: concrete batching facility to include; aggregate storage bins, control office (9.5m2), weigh hopper, conveyors and cement silo. The overall height of the plant above ground level will be 27.85 metres; factory facility (3940m2) for the manufacturing of hollowcore precast concrete flooring including all ancillary works, the overall height of the factory above ground level will be 14 metres; product storage area (2.8 hectares), toilets/shower, changing room & office facility (44m2) and associated effluent holding tank (13.25m2); water settlement tanks (82m2); and all ancillary works. The development will cover an area of 5.5 hectares within the existing permitted sand & gravel/quarry area (quarry ref.QY/24)
Development Address: Baltrasna Townland, Oldcastle , Co Meath
Architect Name: Shane McDermott Location Key: BALTRASNA TOWNLAND
Electoral Division: Incorrect Icl Voter Recor Planner: None
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 17/12/2010 Manager Order: K1804/10
Decision Type: Conditional Number of Conditions: 12
Grant Date: 31/01/2011 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 29/01/2021
Decision Description: concrete batching facility to include; aggregate storage bins, control office (9.5m2), weigh hopper, conveyors and cement silo. The overall height of the plant above ground level will be 27.85 metres; factory facility (3940m2) for the manufacturing of hollowcore precast concrete flooring including all ancillary works, the overall height of the factory above ground level will be 14 metres; product storage area (2.8 hectares), toilets/shower, changing room & office facility (44m2) and associated effluent holding tank (13.25m2); water settlement tanks (82m2); and all ancillary works. The development will cover an area of 5.5 hectares within the existing permitted sand & gravel/quarry area (quarry ref.QY/24)

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: