1) The change of use of the ground floor gymnasium to a retail shop, community hall and community officer, liaison room which will incorporate associated signage and elevation changes to the building. 2.) The introduction of a new communal changing facility to the first floor of the gymnasium. The gymnasium will incorporate a boxing club and fitness studios. 3.) To establish a new entrance to the gymnasium, all as per drawing documents lodged together with all ancillary site works and services
Development Address:
Bailis, Navan, Co. Meath
Architect Name:
McGing Engineering
Location Key:
BAILIS
Electoral Division:
Incorrect Icl Voter Recor
Planner:
Aoife Kennedy
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
31/05/2018
Manager Order:
N746/18
Decision Type:
Conditional
Number of Conditions:
8
Grant Date:
09/07/2018
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
08/07/2023
Decision Description:
1) The change of use of the ground floor gymnasium to a retail shop, community hall and community officer, liaison room which will incorporate associated signage and elevation changes to the building. 2.) The introduction of a new communal changing facility to the first floor of the gymnasium. The gymnasium will incorporate a boxing club and fitness studios. 3.) To establish a new entrance to the gymnasium, all as per drawing documents lodged together with all ancillary site works and services
alterations to a previously approved planning application, Ref. no. NA/20269 for a leisure centre building over two floors, consisting of revised elevational treatment and fenestration, revised internal floor layouts and minor changes to building footprint with all new drainage and water connections made to the existing public sewer and water supply
1) The change of use of the ground floor gymnasium to a retail shop which will incorporate minor elevation changes and associated signage to the building. 2.) The introduction of a changing facility to the first floor of the gymnasium. 3.) To establish a new access/egress to the gymnasium. All as per drwaing documents lodged together with all ancillary site works and services
No Environment Impact Assesments Associated with this Application