a sand and gravel pit with associated processing on 5.29 ha of which approximately 4 ha will be excavated and a concrete batching processing plant with associated works on .64 ha separated by an internal haul road, with the application including screening and washing, mobile crushing of raw materials, silt ponds, topsoil and overburden storage area, screening mound, internal haul road linking the pit and concrete batching plant site, restoration to agricultral lands, concrete batching plant and access via laneway to Lobinstown Road and an Environmental Impact Statement has been carried out in respect of the proposed development
Development Address:
Ricetown, Lobinstown, Co Meath
Architect Name:
Philip Farrelly & Co
Location Key:
Ricetown
Electoral Division:
Incorrect Icl Voter Recor
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
FF 487
Decision
Decision Date:
24/04/2003
Manager Order:
S1249/03
Decision Type:
Conditional
Number of Conditions:
37
Grant Date:
14/07/2003
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
14/07/2008
Decision Description:
a sand and gravel pit with associated processing on 5.29 ha of which approximately 4 ha will be excavated and a concrete batching processing plant with associated works on .64 ha separated by an internal haul road, with the application including screening and washing, mobile crushing of raw materials, silt ponds, topsoil and overburden storage area, screening mound, internal haul road linking the pit and concrete batching plant site, restoration to agricultral lands, concrete batching plant and access via laneway to Lobinstown Road and an Environmental Impact Statement has been carried out in respect of the proposed development
the development will consist of permission for a period of 10 years to construct and complete a Solar PV development with a total site area of circa 97.05 hectares, to include solar panels mounted on steel support on steel support structures, associated cabling and ducting, 12 No. Transformers, 1 No. Temporary Construction Compound, 1 No. Storage Container, maintenance tracks, perimeter fencing and gates, 61 No. CCTV, 4 No. Weather Stations, 3 No. Bunds associated landscaping and ancillary works, with an operational life of 40 years. The application is accompanied by a Natura Impact Statement (NIS). Significant further information/revised plans submitted on this application