construction of an 85 to 4 Bar pressure reduction Station consisting of a boiler house (9m x 3.7m x3.3m)and a pressure reduction skid (13.5m x 5.0m x 3.3m)and all necessary ancilliares
Development Address:
Gormanston AGI , Station Road, Gormanston Co Meath
Architect Name:
Colm Twomey
Location Key:
Gormanston
Electoral Division:
Stamullin - Part of
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
05/04/2006
Manager Order:
S3154/06
Decision Type:
Conditional
Number of Conditions:
5
Grant Date:
08/05/2006
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
08/05/2011
Decision Description:
construction of an 85 to 4 Bar pressure reduction Station consisting of a boiler house (9m x 3.7m x3.3m)and a pressure reduction skid (13.5m x 5.0m x 3.3m)and all necessary ancilliares
to construct an Above Ground Installation at Gormanston as part of the "Scotland to Ireland Second Gas Interconnector Project". The Above Ground Installation will consist of the following: (1) One no. building 15.5 metres long by 7.5 metres wide by 4.6 metres high. (2) one no. building 2 metres long by 2 metres wide by 2 metres high. (3) Filters, heaters, regulators, meters, valves and associated pipework. (4) Electrical and instrumentation equipment. (5) Septic tank. The installation will also require the construction of a site entrance to the proposed site
the development will consist of 2 No. prefabricated single storey boiler houses, each with a gross floor area of 74m2, and 1 No. prefabricated generator kiosk with a gross floor area of 19m2, Associated ancillary services and site works will also be required to facilitate works located at the existing Gormanston AGI, (Above Ground Installation)
development at an existing Above Ground Natural Gas Installation. The development will consist of the replacement of approximately 930m of existing 2.4m high perimeter fencing and associated access / emergency gates with new 3m & 2.4m high security fencing, gates and all associated site works.
extension to an Above Ground Installation for a gas transmission pipeline with 4 no. new buildings inlcuding: Pressure Control Building - 3.0m (h); Boiler kiosk - 3.91m (h); Instrumentation kiosk - 3.14m (h)and an Analyser Kiosk 3.0m (h). The development will also include pipeworks and valves with associated instrumentation and associated equipment
No Environment Impact Assesments Associated with this Application